NC-v4 EQc1 - Enhanced indoor air quality strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by SAJJAD MALIK on
Dear All,
Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.
enhance indoor air quality strategies
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by SAJJAD MALIK on
Dear All,
Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.
Industrial park can be considered as the previously developed site?
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Vang Le Luong on
A new project in the industrial park, which was altered by agriculture use, can be achieved Option 1 of LTc4?
Thanks alot for your respond
DOCUMENTATION
NC-v4 MPR1:Must be in a permanent location on existing landposted by jade dayday on
hi i'm new on LEED,
can we perform preliminary review of uploaded documents even if other requirements aren't completed?
transportation vehicle
NC-v4 LTc5:Access to quality transitposted by jade dayday on
hi,
im new to LEED. can we use approximation on the number of trips on public utility vehicles?
Are there any trade off if using the Existing chiller
NC-2009 EAp2:Minimum Energy Performanceposted by sriram tetali on
Hi all,
The project is an industrial buildings
LEED Compliant Faucets
NC-v4 WEp2:Indoor water use reductionposted by Ann E on
Hi,
Any list of suppliers who can provide a LEED Compliant Faucets?
Estimate annual energy use of the office outside U.S.
CI-v4 EAc4:Renewable energy productionposted by Ameet AA on
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.
Locate Long-term bicycle parking in basement for residential building
NC-v4 LTc6:Bicycle facilitiesposted by Indochine Engineering VN on
Hi, my project is residential building with 3 basements for parking. Is it a must to locate long-term bicycle parking close on the ground floor?
Data Center - Baseline System and ACP
CS-2009 EAp2:Minimum Energy Performanceposted by Michael Wahjudi on
- Our development is having 767.47 sqm of supporting offices and 21,340.69 sqm of data center related area.