LEED ID+C: TIME, BOUNDARY AND OWNER
posted by ARDOR GREEN on
Dear all,
A building with 8 rooms that have similar areas of 3,825 sqm is under construction phase. Its owner wants to get LEED ID+C certification for R&D room.
Is Athena Impact Estimator databses is recommende for South Asia
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Malan Jayawickrama on
I want to know whether LEED is accepting the results of whole building LCA conducted by using Athena Impact Estimator for a Building in Sri Lanka.(Since it is only for North America) Or else what
CFR and O&M plan information
CI-v4 EAp1:Fundamental commissioning and verificationposted by Michael on
Hi LEEDusers,
Filling the Minimum Performance Calculator for PAU-AHUs
CS-v4 EQp1:Minimum indoor air quality performanceposted by Thien Bui on
Hi all, I am working on a Core and Shell project. A Primary Air Handling (PAU) supplies 100% outdoor air to AHUs.
Using a different Energy Consumption in EAc2 to EAc5 to reflect actual conditions
NC-v4 EAc5:Renewable energy productionposted by Tim Middleton on
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption).
Onsite renewable energy- Energy cost offset
NC-2009 EAc2:On-site renewable energyposted by Manikandan S on
Hi All
CxA Experiences in Data Centers
Data-Centers-NC-v4 EAp1:Fundamental commissioning and verificationposted by ARDOR GREEN on
Dear all,
How to Get this credit For VRF System
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by SAMY Chamy on
Hai:- Our project is sewing factory we already provide entryway mate and Exhaust as required, VRF system is used for A/c 1.Is it enough to attend this credit 2.
Shower location
NC-v4 LTc6:Bicycle facilitiesposted by Thu Nguyen on
This credit requires that "Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants
Sound transmission - STC vs Rw
NC-v4 EQc9:Acoustic performanceposted by Indochine Engineering VN on
Hi, It is told that Rw is very similar to STC, I would like to ask for Sound transmission, Does LEED recognize the use of Rw (Weighted Sound Reduction index) and ISO 140 (acoustic) standard instead