Forum quick links
Green Power - Carbon Offset
CI-2009 EAc4:Green Powerposted by Henry Mak on
Hi All, I am working on a project located in China.The owner is the local electric company who has solar power and wind power supply.
unfinished space simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Hongyun Zhou on
My building has four floors, and 4th flr is left empty for future use.
Improving thermal comfort for ski center and ice rink
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Chen Jin on
I am dealing with a complex commercial center that contains a ski center and a ice rink, which clearly fall outside of the comfortable zone of ASHRAE 55.
Documentation upload to LEED Online
CS-v4 EAc1:Enhanced commissioningposted by Erin Rowe on
We are just getting ready to submit LEED CI V4 commissioning documents, and I noticed that it only requests that we upload the table of contents for both the Final Cx Report and Ongoing Commissioni
Is there LEED CS Precertification plaque?
posted by Wangsoo Lee on
Is there LEED CS Precertification plaque?
DCV requirement for high-occupancy areas
CS-2009 EAp2:Minimum Energy Performanceposted by Shenhao Li on
Hello! We have a canteen project in Shanghai. The building has three floors, total GFA is 64,067 square feet. The baseline HVAC system type is system 6.
Faucet Flowrate at Actual Water Supply Pressure
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ran Zhang on
Hi all, I have a question in regard to the flowrate of faucet, whether it should be based on the 60psi specified by LEED or local water supply pressure.
Energy rate of DES Energy simulation
NC-2009 EAc1:Optimize Energy Performanceposted by Renaud Gay on
Hi Guys, I am a energy simulation engineer. Now I have a project which uses the district steam supplied by the local government as heat source.
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.
Questions on ASE and sDA assessment area
NC-v4 EQc7:Daylightposted by Jackie Cheung on
Hello everyone. May I ask 2 questions on option 1 in EQ credit-Daylight? A) Assuming a project go for option 1 in EQ credit Daylight.