Forum quick links
Heat recovery HVAC
NC-v4.1 EAp2:Minimum Energy Performanceposted by Josef Andersen on
Hi!
We are currently discussing a design solutions for the HVAC in a project that should fulfill LEED requirements.
High Voltage Equipment testing scope
CS-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Daisuke Miura on
Hi, I am working on a LEED project as Commissioning Agent.
This is a commercial building project that is build from green field in Japan.
Regional/country-specific (non-US) benchmarks should be allowed outside the U.S. for the right assessments.
posted by Hiro Iwashita on
Our comment/proposal is related to "MR Prerequisite: Assess Embodied Carbon", "MR Credit: Reduce Embodied Carbon" and "Optimized Building Products".
option 2, additional source control and monitoring
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by James Cai on
Hi,
Can the installation of PM2.5 sensor meet this requirement?
Setting up to eQuest about district heating and cooling system
Retail-NC-v4 EAp2:Minimum energy performanceposted by on
Dear person in charge,
I am Kenta Oshiba from ideaship.Inc. I am consultant company in Japan and I support clients who are seeking LEED certification.
Sustainable wastewater management
NC-v4 INc1:Innovationposted by Takayuki Hirota on
We found that this Innovation credit is listed in the innovation catalog under LEED BD+C: New Construction v4.
Chinese Green Electricity Certificate "GECs"
NC-v4.1 EAc5:Renewable Energyposted by Josef Andersen on
Hi!
It came to my knowledge that USGBC does not accept Chinese Green Electricity Certificate "GECs".
20 kinds of permanent installation materials
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by FEI WANG on
We have a hotel project, the use of high-grade wallpaper, valid for more than 10 years, can be counted as permanent installation materials
IARW/IACSC Energy Modeling Guideline for Cold Storage
CS-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello
We are working on a project where room temperature warehouse and refrigeration warehouse are mixed.
Campus approach or not, advantages and disadvantages?
posted by Josef Andersen on
Dear LEED colleagues!
I am working on Volvo with sustainability concerning our new constructions globally.