Applicability within campus boundary limits
NC-v4 SSp1:Construction activity pollution preventionposted by Samer Alhmdan on
Hello, I have multiple buildings within a campus, do we need to implement this prerequisite within the whole campus boundaries, or only within buildings LEED boundaries, noting that there are some
Underground parking areas included?
posted by Maya Karkour on
Hello, We are trying to determine which rating system to use, NC or C&S, for a mixed use project.
Ceramic Wall base
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Neetika Parmar on
Does ceramic wall base have to be certified under Floorscore or does it automatically qualify similar to mineral based flooring tile ??
Ashrae 90.1 2010 Appendix G
NC-v4 EAp2:Minimum energy performanceposted by junaid naseer on
Do we need to follow addendums of ASHRAE 90.1 2010 in relation to Appendix G for compliance? For instance, addendum F restricts window to wall ratio to 34% for hotel/motel with rooms greater than
Terraces used for restaurant seating exempt or not?
NC-2009 SSc7.2:Heat island effect - roofposted by Mario S. on
We are working on a project that has an outdoor roof terrace used as a restaurant seating area.
FAO EToCalc software help
NC-v4 IPc1:Integrative processposted by S. Sachs on
Hello, I'm working on a project in Kuwait and need to achieve the IPc1 credit for water consumption. I've been struggling to use the LEED-recommended ETo calculator tool, produced by the FAO, whi
Shipping Room
NC-2009 IEQc6.2:Controllability of systems - thermal comfortposted by Omar Elrawy on
Dear All, We have a shipping room in our office NC building. The room has 11 lockers, each locker has a chair for 1 occupant.
VRV in Table 1.4
CS-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Hello, I am filling out the Table 1.4 for an office building with mutiple tenants, and each tenant has a separate VRV to serve their space.
Report Contents
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Omar Elrawy on
Concerning Upload IEQp2-5, it is required to upload a differential air pressure test report for each designated smoking room.
credits gained due to implementation hvac load reduction system
NC-2009 IEQc2:Increased ventilationposted by sam Alfassy on
I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes CO2 and other indoor air contaminants, resulting in reduction of fre