Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Minimum Indoor Air Quality Performance Calculation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Amal Venugopal  on 

My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,

1
Thu Aug 31, 2017, 6:23 pm

LEED EBOM Eligibility

EBOM-2009 PIf1:Minimum Program Requirements
posted by  Amgad Khattab  on 

We have a huge existing building which is internally divided into five separate buildings. Each building has its own owner. Can we get LEED EBOM certificate for only one of these buildings?

1
Wed Dec 30, 2015, 5:38 pm

Campus for a gated residential/commercial compound versus ND

LEED Guidance for Campuses and Multiple Buildings
posted by  ABDELHAMID BESHARA  on 

We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.

1
Sat Apr 30, 2016, 4:23 pm

Enhance commissioning

NC-2009 EAc3:Enhanced Commissioning
posted by  Mamdooh Amin  on 

Do we have to include the contract document between the owner and the CxA?

1
Tue Aug 9, 2016, 3:07 pm

LEED 2009 IEQc4.2

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Mario S.  on 

We have received a datasheet for a floor coating that do not state the VOC content.

1
Tue Jan 31, 2017, 4:17 pm

Exterior lighting for group certification

NC-2009 SSc8:Light Pollution Reduction
posted by  Mohamed M. Abd Elhameed  on 

I am currently working on a project with multiple buildings within the LEED boundary. The project will follow group approach registration via campus guidance.

1
Mon Jun 12, 2017, 3:13 pm

P: avarage rainfall event

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  ESRA OZKONUKSEVER  on 

Hi everyone, I got a question about the calculataion of Volume of captured run off; In the formula,(V= P.A.R/12) P value is taken according to the location of project ; humid ,semi arid and arid.w

0

CoC number not mentioned on Invoice

NC-2009 MRc7:Certified Wood
posted by  Deepika Parmar  on 

Hi, For our project the Invoices donot mention the CoC number.

1
Thu May 21, 2015, 6:39 pm

Certificate timeline

ND-Plan-v4 GIBc1:Certified green buildings
posted by  soha yamani  on 

I am working on a neighborhood project in Egypt , and we have been thinking to use LEED v4 for ND Plan , it is stated on usgbc official website that Plan: certification is available to your neigh

1
Tue Mar 22, 2016, 3:08 pm

EAc1 Credits Using DES Option 1 + A lot of Renewables

NC-2009 EAp2:Minimum Energy Performance
posted by  Reniel Barroso  on 

We have a project opting to maximize the 19points of EAc1. The project is served by a District Cooling Plant.

1
Tue Aug 16, 2016, 4:18 pm