Number of transients for FTE calculation

Calculating FTEs
posted by  Sunanda Swain, LEED AP BD+C, PQP  on 

Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.

1
Fri Sep 26, 2014, 12:46 pm

Greenfield or previously developed?

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Ilan Yahav  on 

I'm wondering if a project I'm working on, situated near the coast in Israel, is considers a greenfield or developed area.

1
Tue Aug 29, 2017, 2:20 pm

Stormwater Management Plan

NC-2009 SSc6.2:Stormwater design - quality control
posted by  Nisreen Alhussein  on 

I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?

1
Fri Jul 10, 2015, 12:29 pm

Chilled water flow and pipe sizes

CI-2009 EAc1.3:Optimize energy performance - HVAC
posted by  Jayakumar Pamuri  on 

Hi All, I am here to post my query about chilled water system,flow and pipe sizes.

1
Wed Oct 26, 2016, 7:10 am

Proposed case cooling capacity reducing energy savings

NC-2009 EAc1:Optimize energy performance
posted by  SSN Energy Model  on 

Hi, I am doing energy simulation for G+4 Labor Accommodation building. In base case, i have considered 2.66 COP.

1
Thu Jan 19, 2017, 2:11 pm

EAc 5.1 for LEED C&S

CS-2009 EAc5.1:Measurement and verification - base building
posted by  S Nagarajan  on 

Dear Sir I am involved in a 5-storey building. The base building loads are mixed loads, i.e the loads include lighting and small power.

1
Thu Nov 6, 2014, 11:04 pm

Informal Bus Services

NC-v4 LTc5:Access to quality transit
posted by  Ben Pratt  on 

I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.

1
Tue Mar 21, 2017, 11:43 pm

International Project Epa CGP

NC-2009 SSp1:Construction activity pollution prevention
posted by  ESRA OZKONUKSEVER  on 

Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.

1
Fri Jan 23, 2015, 1:00 pm

ROCKY SOIL

NC-v4 SSc2:Site development - protect or restore habitat
posted by  soha yamani  on 

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?

1
Mon Aug 28, 2017, 6:37 pm

LEED AP BD+C V4 EXAM in one month!

General forums
posted by  Moataz Sakkary  on 

Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?

1
Mon Aug 10, 2015, 2:21 pm