Greenfield or previously developed?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Ilan Yahav  on 

I'm wondering if a project I'm working on, situated near the coast in Israel, is considers a greenfield or developed area.

1
Tue Aug 29, 2017, 2:20 pm

Stormwater Management Plan

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Nisreen Alhussein  on 

I cant find clear cut for Stormwater Management Plan definition, i mean is it using both structural and non structural plans to achieve stormwater quality control?

1
Fri Jul 10, 2015, 12:29 pm

Survey Participants

EBOM-2009 IEQc2.1:Occupant Comfort—Occupant Survey
posted by  Fareed Alghimlas  on 

We’re working towards the certification of a large office building, where a good portion of the (FTEs) are subcontractors who spend time (minimum 40hrs/week) in the building but don’t necessarily h

1
Wed Oct 5, 2016, 5:17 pm

Number of transients for FTE calculation

Calculating FTEs
posted by  Sunanda Swain, LEED AP BD+C, PQP  on 

Hi, I am working on a LEED for Healthcare project (LEED HC v2009). At the moment I am filling out the scorecards. I am bit confused about calculating number of pick hour transients.

1
Fri Sep 26, 2014, 12:46 pm

International Project Epa CGP

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  ESRA OZKONUKSEVER  on 

Hi Y'all, we re working on a project in Turkey and creating an ESC and a SWPPP plan.

1
Fri Jan 23, 2015, 1:00 pm

ROCKY SOIL

NC-v4 SSc2:Site development - protect or restore habitat
posted by  soha yamani  on 

in case of rocky soil , limestone precisely in desert area , what kind of restoration should be done ?

1
Mon Aug 28, 2017, 6:37 pm

LEED AP BD+C V4 EXAM in one month!

General forums
posted by  Moataz Sakkary  on 

Dear All Please guide me if any other way than studying the USGBC book, as I have to take me Exam by 15 of September???!! And what is exactly the eight tips companion workbook ?

1
Mon Aug 10, 2015, 2:21 pm

Narrative for Option 2 Contractor confimration

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Saud Abdul Rasheed  on 

Hi all, We are not going to provide photos for this credit but we have an IAQ plan developed and the contractor has been following it according to the credit requirement.

1
Mon Oct 26, 2015, 1:54 pm

Chilled water flow and pipe sizes

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Jayakumar Pamuri  on 

Hi All, I am here to post my query about chilled water system,flow and pipe sizes.

1
Wed Oct 26, 2016, 7:10 am