Forum quick links
Automatic Receptacle Controls - IECC 2018 v ASHRAE 90.1-2010
NC-v4 EAp2:Minimum energy performanceposted by Cindy Quinn on
We are working on a project that has to comply with IECC 2018 in order to meet the city’s energy code requirements.
Project boundary for rainwater management
NC-v4 SSc4:Rainwater managementposted by Nithya Madan on
Hello,
Marking up EPDs
NC-v4.1 MRc2:Environmental Product Declarationsposted by Martha Norbeck on
I've been dinged for not marking up EPDs, but most EPDs are secure documents that can't be annotated.
VOC emissions evaluation Option 1 vs Option 2
NC-v4.1 EQc2:Low-Emitting Materialsposted by Erin Holdenried on
In the credit calculator, under the Low-emitting criteria column (for Flooring, Wall panels, Ceilings, and Insulation) the drop down box has options for VOC emissions evaluation Option 1 or&nb
Innovation Credits Documentation
NC-v4 INc1:Innovationposted by on
May be a dumb question -- but how do I go about documenting innovation credits? In the innovation form it asks us to list the credit then provide documentation of it.
Shower Facilities - 200 yard requirement
NC-v4.1 LTc6:Bicycle Facilitiesposted by Theresa Lehman on
In LEED v4, the 200 yard requirement was removed for shower facilities.
Light meter to obtain light reflectance of finishes?
NC-v4 EQc6:Interior lightingposted by Erin Holdenried on
We are having trouble getting light reflectance values from the manufacturer for a number of finishes. Has anybody tried using some sort of light meter to get the value yourself?
Finding Products that comply with Thermal Emissivity Reference
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Stephanie Graham on
In the fine print of this credit under the table for adding solar reflectance and thermal emissivity it lists a very recent standard "ASTM/CRRC S-100-2021" which is based on ASTM C1371.
Signage for EV spaces
NC-v4.1 LTc8:Electric Vehiclesposted by Amanda Polematidis on
For those of you who completed the credit, would one sign for an area with EV charging stations suffice, or does each charging station need a sign?