Forum quick links
DEMOUNTABLE CEILINGS
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Brian Kish on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable
Access Point to an Active Freight Rail Line
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Jonathan Payne on
How is "access point" defined for this credit. Is it simply a crossing? It is a more involved distribution site?
Shuttle Bus to Station Still OK?
CS-v4 LTc5:Access to quality transitposted by Brian Salazar on
Under v3, it was possible for projects outside the 1/2 mile walking distance to train transit to meet the credit via shuttle service (public or private), as long as the shuttle was within 2 miles d
Electric Vehicle -required project documentation
NC-v4.1 LTc8:Electric Vehiclesposted by Michelle DeLora on
I have a client asking me about Option 2 - which is ESVE ready for 10% of parking. In the online summary of the credit it does not go into the required uploads.
Imperil and Metric units?
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?
MR credids
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.
Non default use time for lavatory faucets
NC-v4 WEc2:Indoor water use reductionposted by Ruju Rathod on
We would like to use a non default lavatory faucet duration of 15 seconds instead of the 30 seconds.
Monitoring requirement for CAV/VAV system or fan?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Camilo Velez on
Good afternoon all,