Forum quick links
Greenhouse - SRI Value
NC-v4 SSc5:Heat island reductionposted by Irene Chung on
Can a greenhouse be excluded when doing credit calculation? If not, is there a default SRI that we can use for greenhouse roofs?
Street Light BUG Rating
NC-v4 SSc6:Light pollution reductionposted by Danielle Waters on
If Street Lights on the public sidewalk adjacent to public streets are within project scope and LEED Boundary, are they required to comply with BUG Rating?
Biophilic design plan
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Priscillia Champagne on
I understand that the final result must be that the project implements five distinct design strategies.
Acoustic Performance Credit for Residences
NC-v4 EQc9:Acoustic performanceposted by Andrew Parise on
Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.
Rubber Playground Surfacing and Decomposed Granite
Schools-EBOM-v4.1 SSc2:Heat Island Reductionposted by Camila Luong on
Hi! During construction our client has added a playground area and changed a small ampitheater from grass to DG.
Total Roof Area vs. Total Applicable Roof Area
CS-v4 SSc5:Heat island reductionposted by James Jin on
Hi all,
Detailed requirements for Option 1, Path (2)b-2: Life-Skills Training for Social equity within the PROJECT TEAM
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Amie Blankenship on
Regarding 'Social equity within the project team' (NOT WITHIN O+M STAFF) Option 1, Path (2)b-2: Participation in, or providing of, access to workforce development training through Life-Skills train
Can start of 365 data collection period be retroactive?
EBOM-v4.1 EAp3:Energy Performanceposted by Susan Di Giulio on
Hi,
BeCx - Ongoing commissioning plan
NC-v4.1 EAc1:Enhanced Commissioningposted by Manuelle Croft on
The commissioning authority must complete Enhance Cx tasks for the building(s)'s thermal envelope. An ongoing commissioning plan must be developped.