Greenhouse - SRI Value

NC-v4 SSc5:Heat island reduction
posted by  Irene Chung  on 

Can a greenhouse be excluded when doing credit calculation? If not, is there a default SRI that we can use for greenhouse roofs?

2
Default Avatar
Senior Project Engineer
LEEDuser Basic Member
3 thumbs up
Fri Feb 17, 2023, 5:47 pm

Street Light BUG Rating

NC-v4 SSc6:Light pollution reduction
posted by  Danielle Waters  on 

If Street Lights on the public sidewalk adjacent to public streets are within project scope and LEED Boundary, are they required to comply with BUG Rating?

4
Tue Feb 14, 2023, 9:15 pm

Biophilic design plan

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Priscillia Champagne  on 

I understand that the final result must be that the project implements five distinct design strategies.

3
Mon Feb 13, 2023, 9:44 pm

Acoustic Performance Credit for Residences

NC-v4 EQc9:Acoustic performance
posted by  Andrew Parise  on 

Two aspects of this credit seem to make it not achievable for new residential buildings - Reverberation Time <0.6 seconds for residences, and STCc 50 from residences to corridors.

3
Thu Feb 9, 2023, 9:20 pm

Rubber Playground Surfacing and Decomposed Granite

Schools-EBOM-v4.1 SSc2:Heat Island Reduction
posted by  Camila Luong  on 

Hi! During construction our client has added a playground area and changed a small ampitheater from grass to DG.

2
Architect
Jodoin Lamarre Pratte architectes inc
LEEDuser Premium Member
10 thumbs up
Thu Feb 9, 2023, 5:57 am
4
Thu Feb 9, 2023, 5:39 am

Detailed requirements for Option 1, Path (2)b-2: Life-Skills Training for Social equity within the PROJECT TEAM

Pilot-Credits IPpc90:Social equity within the operations and maintenance staff
posted by  Amie Blankenship  on 

Regarding 'Social equity within the project team' (NOT WITHIN O+M STAFF) Option 1, Path (2)b-2: Participation in, or providing of, access to workforce development training through Life-Skills train

0
2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Wed Feb 8, 2023, 12:05 pm

BeCx - Ongoing commissioning plan

NC-v4.1 EAc1:Enhanced Commissioning
posted by  Manuelle Croft  on 

The commissioning authority must complete Enhance Cx tasks for the building(s)'s thermal envelope. An ongoing commissioning plan must be developped. 

0