Forum quick links
Heat Island SRI + Shade
NC-v4.1 SSc5:Heat Island Reductionposted by Cynthia Dehlavi on
A couple question about SS Credit Heat Island Reduction - Non Roof Measures:
LEED v4 Core & Shell or Warehouse & Distribution Center
posted by Laura Long on
We are starting a new project that will designed as a C&S Warehouse. The client's goal is to achieve LEED Silver with minimal cost. We will be using EAp2, Option 2 for this project
SRI value for all paving materials are requested, where to find concrete SRI values?
NC-v4 SSc5:Heat island reductionposted by Milo Aguilar on
Design reviewer suggested to Refer to LEED Interpretation 10411 for a listing of standard nonroof materials in lieu of project-specific testing data, if applicable. But have not been able
Reused materials from project site - burned trees and stone
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Kevin Gilleran on
Good Day,
Carbon offset Canada
NC-v4 EAc7:Green power and carbon offsetsposted by Julie Hardy on
Hello,
I am looking to get carbon offsets for a projet in Quebec. Do you know any good Canadian carbon offsets company that is affordable and meets the requirements?
Do you need to have landscaping in current design to use landscaping water submeter for this credit? & a question about hot H2O.
NC-v4 WEc4:Water meteringposted by Beth Brownlie on
Our project is a model and protype shop at a private art and design institution.
Shower Requirement
CI-v4.1 LTc4:Bicycle Facilitiesposted by Sabrina Flagstad on
Is it okay to have the showers located within the same building as the CI, but not within the LEED Project Boundary?
List of Green Cars?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Erin Holdenried on
Is there current list of cars with a Green Score of 40 or higher? The list on the Green Car website for 2017 only includes vehicles with a Green Score of 45 or higher.
Calculating total cost of materials
CI-v4.1 MRc4:Sourcing of Raw Materialsposted by Cindy Quinn on
To calculate the total cost of materials, can an ID+C project use the default of 45% of total cost of construction? The v4.1 calculator has a separate 'Instructions' tab for BD+C projects (wh