Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Electric vehicles charging stations

CS-v4 EAc2:Optimize energy performance
posted by  Rihab Joucht  on 

I want to make sure if we include the EV charging in Energy Model ? As mentionned in 10499 - EV Charging in Model | U.S.

1
Fri Sep 1, 2023, 5:35 pm
2
Fri Aug 25, 2023, 12:32 pm

Modeling System 5 per floor

NC-v4 EAp2:Minimum energy performance
posted by  Rajat Wadhwa  on 

Hi I am modeling a building with baseline system as 5 now based on Table G 3.1.1 , it says we need to model 1 VAV system per floor, now In reality I have 4 VRF units per floor , should I model one

1
Thu Aug 24, 2023, 8:14 pm

Do Diverse Uses Still Need to Be Publicly Available?

NC-v4.1 LTc4:Surrounding Density and Diverse Uses
posted by  Vanessa Nelson  on 

LEED NC v4.0 says diverse uses need to be available to the public. I don't see that language in the v4.1 reference guide. Was that requirement dropped?

2
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Thu Aug 24, 2023, 1:27 am

If this Pilot Credit is pursued as an ID credit under initial ID+C certification, can Green Cleaning also be pursued?

Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogens
posted by  Susan Di Giulio  on 

If this Pilot Credit is pursued as an ID credit under initial LEED-ID+C v4 certification, can Green Cleaning (as part of the O+M Starter Kit) also be pursued?

4
Sustainability Consultant | Senior Project Manager
Re:Vision Architecture
LEEDuser Premium Member
10 thumbs up
Wed Aug 23, 2023, 4:43 pm

Light Pollution for Large Project Boundaries

Warehouses-EBOM-v4.1 SSc3:Light Pollution Reduction
posted by  Rick Fox  on 

I manage a 550k square foot warehouse operating at 24/7.  All of our building lights, are LED and point down at the ground.   Our pole lights are LED also and point down at a 45 degr

1
Fri Sep 1, 2023, 12:57 pm

Downstream Implementation of Analysis Outcomes

Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysis
posted by  Charles Boechler  on 

This is such a critical part of informing plan decisions in relation to the marketplace value or buyer acceptance.

1
Wed May 21, 2025, 7:07 pm

Seed Evaluator Tool Effectiveness?

Pilot-Credits IPpc89:Social equity within the community
posted by  Charles Boechler  on 

Is the Seed Evaluator the best tool for measuring social equity?

0

Relevant Trades/Contractors at Project Planning Stage

Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workers
posted by  Charles Boechler  on 

From a contract perspective engagement of the professionals is difficulty due to the contract and level of awarenss at planning stages. We have a challenge getting certainty of the key individ

0