Demolition of existing building
Schools-2009 MRc2:Construction waste managementposted by Matthew Heaton on
I’ve encountered a differing of opinions regarding the Construction Waste management credit (MRc2) and could use some help.
Forms Update
posted by Rachael Vidulich on
I need to update my forms on LEED online as most of them are v01 and have "BETA" listed at the bottom.
Energy Modelling Issues
NC-2009 EAp2:Minimum energy performanceposted by Cynthia Estrada on
I am project admin for a V3-2009 NC project and wondered if anyone had issues with energy modeling software and accuracy of results with complicated/unique systems?
seashells considered recycled content?
CI-2009 MRc4:Recycled contentposted by Dan Governile on
Can anyone tell me if seashells can be a recycled content in the manufacture of cement terrazzo countertops?
Re-submission for Design Review
posted by Madhura Dhayagude on
We are currently working on a project that had submitted documentation for Design review.We were not on board then. After the review, the project went on a hold for a period of almost 3 years.
Epoxy Flooring with ZERO VOC
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Susan Morris on
I have a project with a large area of Epoxy Flooring, this epoxy contains 0% V.O.C.'s does it count as an inert material; or is testing required? Thank you
Reviewr's Comment is requesting labor and delivery
CI-2009 MRc4:Recycled contentposted by Sarah Thompson on
In all my 40 LEED projects I have never included labor and delivery to a material's cost total.
Duct Sealant
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Yaneth Galindo on
I used a duct sealant with VOC = 49 g/l and I am not sure if it complies with IEQ credit 4.1, because I do not know in which category it falls in the table.
Warehouse Office
EBOM-2009 IEQc3.5:Green cleaning - indoor chemical and pollutant source controlposted by Saul Pichardo, AIA on
My project has a 6,500sf office space serving a 207,000sf warehouse/distribution center (213,500sf total area).
Laboratory 90.1 Modeling
NC-2009 EAc1:Optimize energy performanceposted by Victoria Watson on
Hi, I am modeling a laboratory which has a small area of office space for LEED and wanted to check a couple of approaches: 1) The engineers have informed me that the lab has to be a once through sy