Forum quick links
Energy Star eligibility for very large Display Monitors
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Harry Flamm on
Nowhere on the Energy Star site can I find out if 75" wide and larger Professional Display Monitors (such as Samsung or NEC for conference rooms) are eligible or not for an Energy Star rating. I h
Occupants / users of public park
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Deborah Lucking on
Our project includes the creation of a park, and construction of a pavilion with restrooms for park users. The challenge - how do we calculate the number of FTEs using these restrooms?
Functional, usable spaces
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Jeannie Rueter on
What is the definition of "functional, usable spaces"?
Planned/future Photovolatic installation
NC-2009 EAc2:On-Site Renewable Energyposted by Stacey Olson on
I'm working on a project that has installed the infrastructure to support a PV array, and is pursuing Enhanced Commissioning.
High Rise Residential with mixed mode ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nancy Henderson on
We have several high rise residential projects that use a several conditioning and ventilation system.
Valuation of Recycled Content
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Rebecca Pinto on
I would like some clarification on how to calculate recycled content as the v4 Reference Guide is ambiguous, in my opinion. For example, on p.274 of the ID+C ref.
LEED Interpretation 5253
NC-2009 EAp2:Minimum Energy Performanceposted by Monique Belmer on
I'm working on an appeal and the reviewer is asking me why our baseline heating went up significantly between the initial submission and our review response model.
GRI Sustainability Reports
Pilot-Credits MRpc53:Responsible sourcing of raw materialsposted by Christine Robbins-Elrod on
It's unclear where GRI-checked reports fall under the credit requirements - would they be considered self-declared for 1/2 value or third-party verified for full value?
Assemblies
NC-2009 MRc4:Recycled Contentposted by David Brown on
In idiot terms could someone please tell me what makes up an "assembly". I am a glazing contractor working on a LEED project. I have two items needing LEED submittals for the MR4 credit.
RE: LI#10397
NC-2009 EAc2:On-Site Renewable Energyposted by Joe Manganelli on
Hi All, Does anyone have any experience with LI#10397? This LI# stipulates an alternative compliance path for facilities that have 60% or more non-regulated loads. QUESTION 1: I cannot find any