The project is on a college campus, and the site itself if previously developed. We intend to use a wooded area immediately adjacent to the building site, and the Owner intends to maintain this area for the life of the project. HOWEVER, the wooded area is OUTSIDE the Limit of Work (except for some temporary tree-protection fencing in the vicinity) and is nearly as large as the entire area inside the LOW. Do we include this area inside the LEED boundary, or do exclude it and use an Alternative Compliance Path? Thanks!