NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha
Maximum threshold for General VOC emissions compliance?
NC-v4 EQc2:Low-emitting materialsposted by Joanna Switzer on
Hi, I am not finding any info to suggest a maximum VOC limit allowable under the General Emissions. Does "5.0 mg/m3 or more" really include everything greater than 5.0mg?
No FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Claire DeCamp on
We've got a building with no FTE - it houses mostly lab equipment that is managed by a researcher and then left alone. There are no restrooms, offices, etc.
Spaces controlled by both daylight and occupancy sensors
CI-2009 EAc1.2:Optimize energy performance - lighting controlsposted by Edgar Arevalo on
I have a project that has spaces which are controlled by both an occupancy sensor and a separate daylight sensor that is installed within 15 feet of the windows.
Definition of "Sourced"?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Douglas Flandro on
The credit language says,"For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base co
EAP2 Minimum Energy Performance -- How to classify building
EBOM-2009 EAp2:Minimum energy efficiency performanceposted by cathy keagle on
We have a client that would like to attempt to certify one building that is part of a college campus. This building is primarily instructional classrooms, some office space, and an auditorium.
Loss of points after certification and ramification
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by howard finkel on
One of our recently completed projects obtained Lead Silver and part of the points were based on NC-2009 SSc4.3: and SSC4.4.
Where is form Plf3-1?
NC-2009 PIf3:Occupant and Usage Dataposted by Ileana Schinder on
I'm looking for the form required to comply with "Complex Occupancy" under form PLF3. I have a Rec Center with low full staff occupancy (5) but VERY HIGHT Peak transient occupants (642).
ACP and Regional Priority
NC-2009 RPc1:Regional priorityposted by Joanna Jenkins on
I suspect I know the answer to this, but I'm wondering if others have any experience with earning Regional Priority points having used an Alternate Compliance Path.
Eye Wash Basins in a Lab
NC-2009 WEp1:Water use reductionposted by Aru Sau on
Would a Eye Wash Basin in a Laboratory be considered as Process Water and should not be included in the credit calculation?