Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Implementing IAQ testing shell space

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Summer Minchew  on 

Noting that an equivalent to IEQc3.2 is not available within the LEED-CS rating system, is it safe to assume that future tenant space(s) within a LEED-NC project would not be subject to IAQ testing

3
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Aug 1, 2017, 10:59 pm

ID and exemplary performance?

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  cristina algaze beato  on 

We're pursuing one points on this credit as Innovation in Design for a LEED-CI 2009 project. Can we achieve an exemplary performance point too?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Aug 1, 2017, 5:31 pm

EnergyStar Reporting

NC-2009 EAc5:Measurement and Verification
posted by  Karl Heitman  on 

Our project is registered under LEED 2009, and my Reference Guide doesn't show Option 3. Is the Option 3 new? Is it for exemplary credit only?

3
Default Avatar
LEEDuser Expert
472 thumbs up
Tue Aug 1, 2017, 3:31 pm

Cooling Tower Meter

NC-v4 WEc4:Water metering
posted by  Joseph Snider  on 

We are trying to determine if our cooling tower meter would count as one of the meters.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Jul 28, 2017, 5:34 pm

Green Cleaning as NC ID credit

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Jordan Kirrane  on 

Hi, I am pursuing Green Cleaning as an ID credit for a NC v3 building. Does anyone know when does the performance period begin?

6
Tue Jul 25, 2017, 3:25 pm

Partitioned office space clarification

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

For WELL 80 SOUND REDUCING SURFACES, Part 2: Walls; c. Partitioned Office spaces: Do these partitions need to surround the occupant on three sides, or, can it just be in front of the user?

5
Interior Designer
HKS
LEEDuser Basic Member
0 thumbs up
Tue Jul 25, 2017, 5:37 am

Reciprocity b/w ESv3 and LEED MF midrise

Mid-Rise-v4 EAp1:Minimum energy performance
posted by  Smita Thomas  on 

A client needs an energy model for a multifamily midrise that is applying for LEED v4 and also applying for Energy Star.

3
Default Avatar
Principal
Energy Shrink, LLC
LEEDuser Basic Member
1 thumbs up
Fri Jul 21, 2017, 4:39 pm

small community adjustment

NC-v4 LTc5:Access to quality transit
posted by  nancy picard  on 

For LEED 2009, there was CIR 431 from the CaGBC that adjusted frequency for communities under 50,000 people. Is there a similar adjustment acceptable for LEED v4?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Jul 21, 2017, 1:18 pm

Option 3 fueling capacity determined by time limit?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Erica Downs  on 

Our project is at a large university, and a 2-plug Level 2 station has been installed.

9
Default Avatar
Sustainability Analyst
SAS Institute Inc.
LEEDuser Premium Member
5 thumbs up
Thu Jul 20, 2017, 3:51 pm

LEED CI 2009 Innovation option: Monitoring Based Commissioning

CI-2009 IDc1:Innovation in Design
posted by  Margaret Montgomery  on 

This option in the innovation catalog is noted as adapted from LEED v4 EAc Enhanced Cx, and I'm not clear if it would be counted as an additional above-2009-enhanced-cx strategy, or if it's somehow

2
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Jul 20, 2017, 2:37 pm