Forum quick links
IAQ management plan-during construction or before occupancy
NC-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Kali Wolin on
I am wondering if you can obtain the credit for Construction IAQ management plan DURING CONSTRUCTION along with BEFORE OCCUPANCY or if it is just one credit or the other.
Budget Method
NC-v4 EQc2:Low-emitting materialsposted by LUCY WILLIAMS on
We have one non-compliant product on the project to date. It is a PVC glue- less than a liter was used.
Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
3% refueling for future Retail-CI tenant
posted by Katie Peterschmidt on
Our LEED-NC project is required to provide tenant guidelines per CIR 10102.
25ft of entrace located near corner of building
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Mary Grace Wong on
Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.