Forum quick links
3% refueling for future Retail-CI tenant
posted by Katie Peterschmidt on
Our LEED-NC project is required to provide tenant guidelines per CIR 10102.
25ft of entrace located near corner of building
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Mary Grace Wong on
Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?
FTE of unoccupied gutted adjacent tenant
posted by Andrew Bennett on
under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors
Free Address vs. Full Flexibility
posted by Carina Clark on
WELL's Intent for feature 82 Individual Thermal Comfort is: To maximize and personalize thermal comfort among all occupants.
Commercial Kitchen
CS-2009 IEQc8.2:Daylight and views - viewsposted by José Solis on
I have a mixed use office building with the potential for restaurant tenants on the ground floor.
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
FAR for parks with pavillion
NC-v4 SSc3:Open spaceposted by nancy picard on
I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Heated Bus Storage
NC-v4 EAc2:Optimize energy performanceposted by Victoria Watson on
Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.