Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

3% refueling for future Retail-CI tenant

Credit Forums
posted by  Katie Peterschmidt  on 

Our LEED-NC project is required to provide tenant guidelines per CIR 10102.

1
Tue Nov 3, 2015, 8:03 pm

25ft of entrace located near corner of building

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) control
posted by  Mary Grace Wong  on 

Does the 25ft referring to a straight line measurement? Or, it's following the building footprint?

1
Sat Aug 26, 2017, 3:39 pm

FTE of unoccupied gutted adjacent tenant

Credit Forums
posted by  Andrew Bennett  on 

under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors

0

Free Address vs. Full Flexibility

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

WELL's Intent for feature 82 Individual Thermal Comfort is: To maximize and personalize thermal comfort among all occupants.

1
Thu Sep 7, 2017, 7:56 pm

Commercial Kitchen

CS-2009 IEQc8.2:Daylight and views - views
posted by  José Solis  on 

I have a mixed use office building with the potential for restaurant tenants on the ground floor.

1
Fri Apr 8, 2016, 3:06 pm

Feedback on test results?

CI-v4 EQc4:Indoor air quality assessment
posted by  Joanna Switzer  on 

Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Fri Sep 1, 2017, 12:19 am

FAR for parks with pavillion

NC-v4 SSc3:Open space
posted by  nancy picard  on 

I would like to know if there have ever been special considerations for the FAR calculation, like when considering a municipal pavilion with a park for example?

3
Thu Aug 31, 2017, 2:02 am

The Eco Declaration

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Kristopher Croghan  on 

Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Wed Aug 30, 2017, 12:51 pm

Heated Bus Storage

NC-v4 EAc2:Optimize energy performance
posted by  Victoria Watson  on 

Hi, I am trying to work out the best way to model a heated (cold climate) bus storage facility in the baseline.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 30, 2017, 3:25 am

Using different energy rates between CHP Proposed and Baseline

NC-v4 EAp2:Minimum energy performance
posted by  Mark Benson  on 

I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Aug 29, 2017, 8:38 pm