Forum quick links
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
Parking Capacity - Police Station
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Joe Malone on
Working on a new police station and trying to find a route to get SSc4.4 (LEED 2009). Anyone have any thoughts? We have public and secure parking which is for police vehicles only.
Fiberglass Wall Panels - GreenGuard Select Education, Healthcare
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Michele Helou on
We have Crane Fiberglass wall panels at janitor closets; I assume they should be included for this credit as a 'wall covering'. The product has certifications for Greenguard Select Education and Gr
LEED EBOM 2009 IEQc3.1 Form
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Alicia Ravetto on
Can you help me locate the blank form (that does not say for reference only) to use in submitting an Innovation Credit?
Building with no FTE
NC-v4 LTc6:Bicycle facilitiesposted by Nathan Gauthier on
Has anybody proposed eliminating showers and / or long-term bike storage in a building with no FTE? We're renovating a small wood-frame classroom building with 8 classrooms.
Ventilation Effectiveness
posted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Additions, Separate Utility Building, Campus Site
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Michele Helou on
I'm trying to verify an acceptable LEED Project Boundary for a LEED NC v3 project.
Complex projects benefit from turn-key waste mgmt services
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Joanna Switzer on
The recently completed Dr.
Tenant Sub-Metering
CI-2009 EAc3:Measurement and Verificationposted by Donald Green on
Our tenant will have sub-meters installed on the lighting and HVAC electrical panels on each floor of their tenant space.
EA Credit 1 Optimise Energy Performance - reaching criteria
CI-2009 IDc1:Innovation in Designposted by Anna Brodersen on
Right now our project for an office building is en route to meeting the criteria of the updated LEED 2009 EA Credit 1 for optimising energy performance.