Forum quick links
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional Priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
SSc4.1 Bus Rapid Station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Christopher Widdowson on
Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.
Is Cradle-to-Cradle Certification acceptable?
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Chris Moore on
I have a styrofoam insulation that has zero VOC out put. The supplier claims it undergoes VOC small scale chamber testing by MBDC and the product is cradle-to-cradle certified.
Motorcycle Parking Under Cover
NC-v4 LTc7:Reduced parking footprintposted by Dana Waters on
Can you please help to clarify? What if the motorcycle parking is under cover of a shade structure?
Steam Kettles for Process Water Use
Retail-CI-v2009 WEp1:Water use reductionposted by David Hryvniak on
I'm working on a project that is installing steam kettles for commercial food service. The equipment consists of two 6-gallon kettles mounted on a modular base.
Resinous Flooring
CI-v4 EQc2:Low emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?
Will Sit/Stand desks become standard?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Ron Finney on
Have your clients begun asking for this to become their new standard? I haven't seen this yet but we are starting to use them more and more. frequently.
90% controls for open office systems furniture
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Brian VanAllen on
As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?