Forum quick links
LEED V4 Canada, paint Questions
posted by Francois Bellefleur on
Good morning, first time here, with the new LEED v4 in Canada I have a few questions about the paint for new construction. Does the regional distance of 800KM still in place in LEED V4 ? Does the V
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
Double Ridership - access to transit station
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Erin Holdenried on
If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.
Indoor recreational facility
ND-Plan-v4 NPDc10:Access to recreation facilitiesposted by Sarah Kearney on
Hello, Would an indoor gym that's at least 25,000 square feet and available to anyone (non members can pay for a day pass) be acceptable?
Male occupant usage w/ family rstrm next to gang rstrms
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Renee Shirey on
Since the default assumption is that 100% of male occupants will use a restroom with a urinal, how do you calculate the usage when there is a family toilet (without a urinal) next to the large gang
Surrounding Density - Previously Developed Site
NC-v4 LTc4:Surrounding density and diverse usesposted by Dana Waters on
In the Required Documentation section of the Reference Guide, it states that a project must provide a "description of the previous development on the site." How does USGBC define the "site" in thi
Rail Station Proximity - On Demand Shuttle
Healthcare-v2009 SSc4.1:Alternative transportation - public transportation accessposted by Crina Bosch on
I remember hearing discussion at a Greenbuild Session that mentioned changing the restriction from 1/8 mile. Does anyone else know if this is true?
existing building modeling
CS-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am modeling an existing building right now. The opaque envelope will be maintained (walls and roof) but the entire inside, all HVAC systems, and windows will be replaced.
High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Lindsey Kindrat on
Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.
Master's Research Survey
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.