Forum quick links
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t
Any HAP Expert?
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I use Carrier-HAP and according to ASHRAE 90.1 G.1 #4, all baseline HVAC fans should be running continuously when the space is occupied and cycled when the space is unoccupied.
Existing buidling assembly
Schools-2009 EAp2:Minimum Energy Performanceposted by soham babu on
If we are not knowing existing assembly values can we go with ASHRAE 90.1 values for existing assembly. USGBC will approve ?
Adding carpet to LEED Platinum NC building
posted by Alireza Anvari on
Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.
Documentation
Healthcare-v4 MRp3:PBT source reduction - mercuryposted by David Dixon on
Working on a v2009 BD+C project and using the credit as an ID credit looking for information on accepted documentation. Any insight will be helpful
Existing Chillers in Basement (not in project boundary)
CI-v4 EAp3:Fundamental refrigerant managementposted by Heather Zeto on
Our project is a 4-floor fit-out of a hospital tower (Less than 200,000 SF of an existing 8 Million SF building).
Testing of units with the same layout
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Ilana Judah on
We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts.
U-value and SHGC for Baseline Fenestration in ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.
Do classrooms have individual work stations?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Helene Lefkowitz on
I'm working on a LEEDv3 university building that is pursuing certification for NC instead of Schools.
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.