Major Renovation prerequisites
posted by Vanessa Poirier on
Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.
How do I know if my project is in a LEED ND community
posted by Erika Duran on
Is there are a resource out there that lets you know if your building is located in a LEED ND property? I tried GBIG but doesn't seem to have ND projects in their database.
MRc4 Recycled Content Calculation
NC-2009 MRc4:Recycled contentposted by Jack Jennings on
Can Division 2 materials (hardscape, storm/sanitary utilities, landscaping) be excluded from the overall material cost when calculating for this credit?
long term lease as NC innovation credit
CI-2009 MRc1.1:Tenant space - long-term commitmentposted by Maggie Pipek on
Has anyone ever successfully modeled an ID credit for the NC rating system after the CI MRc1.1 Long Term Lease credit?
Building Flush - Filter Change?
CI-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Brianne Smith on
Our project is pursuing Option 1 Path 2 - Flush During Early Occupancy. Do filters need to be replaced after the flush, or only after construction as part of IEQc3.1?
Residents excluded?
EBOM-2009 SSc4:Alternative commuting transportationposted by Miranda Lescaze on
A portion of our building is office space and a portion is multi-family senior residences.
What are the baseline conditions?
EBOM-v4 SSc5:Site managementposted by Zachary Hayes on
This says we have to reduce from the baseline, which I assume is our initial reported use. However, if this is the case how can there be any reduction?
Conflict of interest?
NC-v4 EQc4:Indoor air quality assessmentposted by emily reese moody on
Are there any conflict of interest concerns if a contractor hires the air testing company versus the owner or A/E?
Equipment Baseline
Pilot-Credits EApc3:Medical and process equipment efficiencyposted by LUCY WILLIAMS on
Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.
Daylight Measurements disappointing
NC-2009 IEQc8.1:Daylight and views - daylightposted by Joyce Kelly on
1.Measurements were disappointing July 15 because shading structures are doing their job and blocking direct sunlight - a blessing in Southern Arizona. Should we wait until the nx.