Forum quick links
Slab on grade and concrete piers
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Browne on
I have a large building with an arena at the second level. I am retaining the slab on grade on the first level except for some small cuts to run piping.
Addition to Existing Leed EBOM Building
posted by Max Neu on
Forgive me if this has been answered, I searched all over and can't find a definitive answer.
Regularly Occupied Space + Basement View Access
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Ryan Kurlbaum on
We are doing a zero-lot line project in NYC on a very narrow site.
residents of Multi-residential project
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Yan-Chuan Chen on
Hi All, I am working on a multi-residential building. However, the residents number should put based on the LEED Ref. Guide or on building code?
Is it OK to use different units of measurement for MRc6 + MRc7?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Craig Wilson on
A client had a waste audit done for MRc6 in weight (36% landfill diversion) and we analyzed MRc7 in volume (55% landfill diversion).
1 year contract?
NC-2009 EAc6:Green powerposted by Erin Holdenried on
In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.
100% OA Laboratory System
NC-v4 EAp2:Minimum energy performanceposted by Charles Daze on
I have a HVAC system with labs on it requiring 100% outside air systems. Following all the guidance in 90.1 these spaces require a dedicated Sys 5/7 because they are over 5,000 cfm.
IAQ Procedure is NOT acceptable?
CI-2009 IEQp1:Minimum IAQ Performanceposted by James Keohane on
I recently received a Design Review comment advising that the IAQ procedure included in Chapter 6 of the ASHRAE 62.1-2007 is not an acceptable tool to demonstrate compliance.
Existing Building, Renovations Taking Place Piecemeal
CI-v4 EQc4:Indoor air quality assessmentposted by Sara Zoumbaris on
We have a university lab project that is renovating a select number of rooms, with varying materials/ systems being replaced at different times.
Garage Space - Negatively Pressurized Rooms
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Panda Aumpansub on
Hello there, For garage spaces that are designed for CO/NO₂ monitoring and have a neutral (Exhaust air – Supply air = 0) pressurization.