Forum quick links
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
Missing: Design/Construction designation & "ready for review"
posted by Teresa Stern on
Our project was changed over to LOL v4 but there are no designations for Design vs Construction credits.
ECp2 and c1 - Location of this Addendum?
posted by Michelle Bracewell-Musson on
Hello Tristan, My team has had a bit of a challenge trying to find "like" manufacturing buildings that are conditioned.
Zero Lot Line calc
NC-v4 SSc4:Rainwater managementposted by Janika McFeely on
Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Avery Colter on
OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.
Major renovation of historic district bldg in historic district
posted by Pamela Smith on
Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.
LEED CI Regional Priority Documentation
CI-2009 RPc1:Regional priorityposted by Bethany Beers on
It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
SSc4.1 Bus Rapid Station
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by Christopher Widdowson on
Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?
Modeling HVAC for future un-designed office space
NC-2009 EAp2:Minimum energy performanceposted by Vernon Smith on
I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.