Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Public Shuttle to Ferry/Rail

NC-v4 LTc5:Access to quality transit
posted by  Kristen Magnuson  on 

I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub

1
Mon Aug 28, 2017, 3:55 pm

Missing: Design/Construction designation & "ready for review"

General forums
posted by  Teresa Stern  on 

Our project was changed over to LOL v4 but there are no designations for Design vs Construction credits.

1
Tue Mar 10, 2015, 12:40 pm

ECp2 and c1 - Location of this Addendum?

General forums
posted by  Michelle Bracewell-Musson  on 

Hello Tristan, My team has had a bit of a challenge trying to find "like" manufacturing buildings that are conditioned.

1
Tue Aug 29, 2017, 4:33 pm

Zero Lot Line calc

NC-v4 SSc4:Rainwater management
posted by  Janika McFeely  on 

Does anyone have more detail on the FAR requirement for documenting a zero lot line project? Is it like the density credit in that you only need to include buildable land?

1
Tue Apr 21, 2015, 6:03 pm

ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls

NC-2009 IEQc5:Indoor chemical and pollutant source control
posted by  Avery Colter  on 

OK, so a reviewer directed me to the 2011 ASHRAE HVAC Applications Handbook.

0

Major renovation of historic district bldg in historic district

LEED Rating System Selection
posted by  Pamela Smith   on 

Renovating of 1980s renovation of a 3 story office building in a historic district. Basically zero lot line, it has small pooled parking with neighboring buildings.

1
Sat Aug 26, 2017, 7:57 pm

LEED CI Regional Priority Documentation

CI-2009 RPc1:Regional priority
posted by  Bethany Beers  on 

It's not clear to me where to document the points for RPC's. At the end of each template, there is a check box for ID points, but nothing for RPC points.

1
Tue Mar 15, 2016, 7:53 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IEQc7.2:Thermal comfort - verification
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

1
Mon Jun 1, 2015, 9:00 pm

SSc4.1 Bus Rapid Station

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Christopher Widdowson  on 

Are there any post criteria or definitions of what constitutes a Bus Rapid Station or Terminal?

1
Thu Sep 8, 2016, 11:42 pm

Modeling HVAC for future un-designed office space

NC-2009 EAp2:Minimum energy performance
posted by  Vernon Smith  on 

I am modeling a 50,000 sf college cafeteria that has a basement, a main floor and a mezzanine. A portion of the basement is part of the cafeteria.

1
Fri Dec 9, 2016, 3:38 pm