Forum quick links
Enhanced Refrigerant Management - Purchased Cooling Loop
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Vinny Greco on
If a university building is tied in to a campus chilled water distribution, does the campus chiller plant have to be included in the building's refrigerant use?
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.
Tree grates
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by sue bryant on
Can the metal grates used where trees are planted in a hardscape count as open paver area [as long as the 50% open grid is achieved]?
insulation thickness versus energy modeling
NC-v4 EAp2:Minimum energy performanceposted by Jennifer Webb on
We are running into a situation where the insulation is slightly under the R38 (R34.8) that is required per ASHRAE 90.1 yet the energy model shows we are over 10% energy efficient.
If you are already meeting SS c8...
Pilot-Credits SSpc55:Bird collision deterrenceposted by Cynthia Kaplan on
...Then the lighting requirements for SS pc55 should be a foregone conclusion, no?
Natatorium Locker Rooms
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carl Karlen on
I am filing out the LEED documentation for IAQc1 for a Rec Center in St. Louis, MO. There is a Natatorium in this Rec with attached Locker/restroom/shower spaces.
ID credit for college or university
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Cindy Quinn on
Has anyone had luck submitting this credit and/or IEQc9 as an ID credit for a college or university?
SSpc14 Walkable Project Sites - navigating process
Pilot-Credits PC14:Walkable Streetsposted by Margaret Montgomery on
Wow. The credit makes some sense, but the process is definitely a challenge. I just spent 20 minutes trying to find the survey to complete it.
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.
Recycling Areas for Multifamily/commercial project
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Rob Hink on
I am working on a multifamily housing project with commercial spaces. The commercial spaces are on the first 2 floors. There will be individualized retail space and office space.