Forum quick links
Varying Transit Schedules
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Risto Beatty on
I am working on a project located on a college campus where various university bus lines provide 350 rides per day while school is in session.
Certified Wood & Hardware
CS-2009 MRc6:Certified Woodposted by Bryan Finnegan on
Our invoices do not break out any hardware used with the millwork as a separate line item. Is it required to exclude these values for Certified Wood?
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?
Parking spaces
Retail-NC-v2009 SSc4:Alternative transportationposted by Megan Bove on
Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?
Rooftop Greenhouse
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Sarah Nugent on
Hi everyone, I have an urban project which is installing a greenhouse for educational purposes.
Roof for School
Schools-NC-v4 EQc2:Low emitting materialsposted by Josh Inge on
If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?
Documentation for Plan
ND-Plan-v4 GIBp1:Certified green buildingposted by David West on
For certification of at the plan stage I assume that GBCI doesn't expect a building to be constructed and certified.
Reopening one path of LEED-CI SSc1.2 in Construction Review
CI-2009 SSc1:Site Selectionposted by Susan Di Giulio on
In preliminary design review, we had attempted the Brownfields point, which is an option in SSc1.2.1, as well as 4 other points in that credit.
Thermal Barrier Tape and EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Webb on
I talked to a leading manufacturer of thermal barrier tape which typically requires an EPD to be included in the credit.
Performance Period
EBOM-v4 WEp2:Building-level water meteringposted by Matthew Hanks on
I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?