Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

RE: SSc5.1: It looks like a greenfield site but may not be???

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Joe Manganelli  on 

Hi All, I am working on a 200 acre site that looks like greenfield farmland.

1
Sat Jan 7, 2017, 10:52 pm

Multi-family Mid-rise EA Pre-req 1 - Option 2

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Pournamasi Rath  on 

Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%

1
Thu Jan 26, 2017, 8:53 pm

How to Apply Research Park Guidelines when Zoning is silent

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Maggie Hogan Skaug  on 

A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.

1
Thu Apr 7, 2016, 1:36 am

Diverse Uses - Document Nearby Uses

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Maria Fiorelli  on 

Previously in v2009, to document 'Community Connectivity' we would use a radius around our project on Google Earth, marking the diverse uses with icons.

1
Sat Aug 26, 2017, 4:39 pm

Mixed Use, Mid Rise Residential, CO2 in units?

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Joanna Jenkins  on 

My firm has had success not including CO2 sensors in units of mid-rise residential project under LEED v3 NC.

0

Commercial Refrigeration Systems

EBOM-v4 EAc8:Enhanced refrigerant management
posted by  Meier Corporate Account  on 

I would like some clarification on what LEED considers a commercial refrigeration system in regards to leak check reports. I have 2 different systems in my plant...

1
Fri Aug 19, 2016, 4:54 pm

Policy Template - Maintenance Equipment "goals"

EBOM-v4 SSp1:Site management policy
posted by  Maureen Colburn  on 

In the Site Mgt Policy template for this prerequisite under the "goals" section for maintenance equipment, 3 options to select from are listed (limit grass, use only manual or electric equipment,

1
Fri May 1, 2015, 9:56 pm

residential kitchen - spray nozzle

NC-2009 WEc3:Water Use Reduction
posted by  Erin Holdenried  on 

Regarding a residential kitchen sink that has a faucet and a spray nozzle, would the spray nozzle be measured against the baseline flow rate of a kitchen faucet or a pre-rinse spray valve?

1
Thu Aug 11, 2016, 3:36 pm

Air economizer in baseline model

CS-2009 EAc1:Optimize Energy Performance
posted by  Jeff Riggs  on 

If your climate zone does not require air econmizer for baseline systems (90.1 2007, climate zone 4a) are you allowed to model your proposed systems with economizer, per design and not have economi

1
Tue Nov 15, 2016, 11:21 pm

Advantages of v4 Schools over NC

LEED Rating System Selection
posted by  GBD Architects  on 

Hi all, We are analyzing a project that is on a higher ed campus but serves pre-K students.

1
Fri Feb 3, 2017, 6:43 pm