Forum quick links
EAcp66 Community Contaminant Prevention- Airborne Releases
NC-v4 INc1:Innovationposted by Helene Lefkowitz on
Our project team found the Community Contaminant Prevention- Airborne Releases to be a great pilot credit to continue working toward a more pure indoor air quality.
Individual task lighting
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by ethan adams on
Are rechargeable battery-powered task lighting units acceptable for this credit?
discrepancy between CS and BD+C
CS-v4 LTc7:Reduced parking footprintposted by Gail Napell on
CS does not have a credit for Green Vehicles? still looking for a specific CS scorecard; USGBC website provides the BD+C scorecard at the CS link
Spreadsheet from USGBC is password protected
CI-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Keith Steurer on
Is there any way to modify / add new tabs to the USGBC-Approved Data Template for MPR #6? It seems to be password protected and allows only limited editing.
USGBC Approved Certification Programs
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Amy Ruffino on
Has the USGC given any updates on what programs are also approved for this credit? As stated in previous comments, Division 9 is almost impossible to find BIFMA.
Motorized Gravity Dampers ASHRAE 90.1 Mandatory Requirement
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
Per the Mandatory Requirement of ASHRAE 90.1-2007 section 6.4.3.4.2 a gravity vent is required to be equipped with dampers that shut automatically. Though the 90.1 does not have an exception if th
Campus
Pilot-Credits PC14:Walkable Streetsposted by Megan Recher on
We are applying the pilot credit in a campus setting, where the primary façade fronts a pedestrian plaza, as opposed to street.
Low Flow Sink
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Ray Jones on
All, Is a break room sink in an office space considered a kitchen sink with a 2.2 gal/min baseline or a commercial lav with a .5 gal/min baseline?
High Process Load and Equipment Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Shad Traylor on
Our project is a manufacturing plant which is seeking certification under NC Core and Shell v2009.
Sample LEED 2009 Basis of Design Document
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Robert Shields on
I have a sample Basis of Design document that applies to LEED 2.2. Not sure if there are any differences in the requirements for the document required in LEED 2009.