Forum quick links
Walk-off Mat Width Requirement
CI-2009 IEQc5:Indoor chemical and pollutant source controlposted by Itzel Meynard on
My project is LEED 2009 commercial interiors. I understand the entryways are required to be 10 feet in the direction of travel inside the building.
43" partitions block views and negate compliance?
EBOM-2009 IEQc2.4:Daylight and viewsposted by Vanessa Seibert on
I see that there was some conversation on the views credit back in 2011.
Baseline system for water loop heat pump in Proposed case
NC-2009 EAp2:Minimum energy performanceposted by Mayank Bhatnagar on
Hello everyone, I am working on a residential project. The proposed case HVAC system is Water loop heat pump with cooling tower and natural gas based condensing boilers.
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?
Alternative Compliance Path - C&S LEED Threshold reduction
CS-v4 EAp2:Minimum energy performanceposted by MKK LEED on
Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?
PC 29 Index
Pilot-Credits PC29:Housing and Jobs Proximityposted by Gary Hansen on
We registered for this credit back in 2011 and we are finally completing the project. I think I just need to participate here and complete the online survey.
District Central plant heating only
NC-2009 EAp2:Minimum energy performanceposted by Vipul Babriya on
I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.
Regularly Occupied or Not?
NC-2009 IEQc8.1:Daylight and views - daylightposted by Cynthia Estrada on
Hello- I don't know if anyone has asked this question or not, it is a rather unique situation.
USGBC Approved Environmental Product Declaration Framework
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Gary Brock on
It still isn't clear to me what is meant by "USGBC approved environmental product declaration framework" which is applicable for pursuing either option 1 or option 2.
Envisioning this credit for condo building in Harlem
EBOM-v4 LTc1:Alternative transportationposted by Charlotte Matthews on
Residents and condo owners rarely respond to surveys.