Peak discharge/flow rate
NC-2009 SSc6.1:Stormwater design - quantity controlposted by hana manai on
Which formula do you use to calculate peak flow rate (1 and 2-year, 24hours). I am using NRCS (SCS) TR-55 Graphical Discharge Method. Is that recommanded?
LEED-H Water Use
Homes-v2008 WEc3:Indoor water useposted by Robyn Vettraino on
Is there a tie-in somewhere that requires individually metered homes/units in LEED for Homes?
Multifamily Buildings
EBOM-v4 WEp1:Indoor water use reductionposted by Zachary Sherman on
For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?
M&V Plan
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Akshay Odugoudar on
Does the M&V Plan for EAc5.2 have to include what tool is being used to calculate the baseline energy use of the building?
C&S 2009 Retail tenant space
CS-2009 IEQc6:Controllability of systems - thermal comfortposted by London Huenefeld on
I am working on a C&S project in which most of the tenants are retail stores.
WEp1 for Shopping Center
posted by Nate Steeber on
Hello all, We have a shopping center interested in certification with 10 buildings.
Concrete Formwork
CS-2009 MRc5:Regional materialsposted by Mike Zupan on
Should I include temporary materials, such as concrete formwork and shoring, in the documentation for MRc5? Thanks!
Diverse Uses within a Shopping Center
CS-v4 LTc4:Surrounding density and diverse usesposted by Frank Sherman on
The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.
Alternative Compliance Path
Schools-2009 SSp2:Environmental site assessmentposted by timothy thomas on
I am working on a project that at the initial project team meetings and scorecard review it was indicated that the Phase 1 ESA had been done and that there were no significant issues.
1-Existing to Remain Parking Space, Reserved for ADA
NC-v4 LTc7:Reduced parking footprintposted by Sara Zoumbaris on
Hello, We have a project that will designate the 1-existing parking space for ADA upon project completion.