Forum quick links
Existing Conditions
NC-v4 WEp1:Outdoor water use reductionposted by Craig Graber on
This is Josef Abboud from Atelier Ten For outdoor areas within a renovation project scope (i.e.
Maximum number of ID points allowed
CI-2009 IDc1:Innovation in Designposted by javier torres on
Hi there, I'm working on LEED NCv2009 project and trying to find out if there is a limit as to how many points can be earned in the ID category. The LEED checklist shows up to 6 points (1.1 thru 1.
construction completion date is outside of performance period
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Jessica Hawley on
We are currently in our performance period for a project where a tenant fit out of a vacant floor is currently in the planning stages & construction may or may not start during our performance
Systems Observed In Person
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Devki Wright on
Our CxA wasn't able to observe lighting controls in person when he came to commission the other building systems.
Natural Ventilation of a Warehouse/Maintenance Building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Phil Stafa on
Has anyone had an issue with complying with ASHRAE 62.1 for natural ventilation of a space that is being used as a maintenance garage? We have 3 garage doors that are open to a large garage type a
MRp1 Can a designated dumpster serve as my area of recycling?
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Shelly Christman on
Hello All, We have a 140,000 SF shell & Core project that is mixed use 1st floor and office space floors 2-6. We are using LEED 2009 C&S.
LEED Construction Submission
posted by Christopher Strunk on
Had a question from a client on when we can submit the LEED-NC 2009 Construction Submission. Can the submission be made prior to all commissioning being completed and documented?
Used Furniture with Recycled Content
CI-2009 MRc4:Recycled Contentposted by Kristine Byers on
Our project is a TI which includes the renovation of several floors of a corporate office building. The tenant is bringing with them a substantial amount of used furniture.
EA Credit 1 ACP (Alternative Compliance Path)
CS-2009 EAc1:Optimize Energy Performanceposted by Harry Flamm on
Can someone direct me to any supporting information that explains the use of the Alternative Compliance Path for EA Credit 1 ACP?
View Preserving Shade
Retail-CI-v2009 IEQc8.1:Daylight and views - daylightposted by Lon Stephenson on
Is there any criteria as far as what a View Preserving Shade actually is? There are openness factors as low as 1%; yes, you can see through them, but not much.