Forum quick links
Question for Required Documentation for Option 1 of this credit
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by JOHN COOK on
I would like to know if USGBC requires the specific species name for plants for this credit, as stated in the reference guide "site plan indicating the project boundary, building footprint, site ar
V4 Advanced Energy Metering Template is Protected
NC-v4 EAc3:Advanced energy meteringposted by Steven Wychorski on
Hello The USGBC approved Data template for Building Energy Metering is locked/protected. It only has 2 meter tabs. My project has 60+ different meters to input.
EBOM SSc2: policy vs practice for snow removal
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Drew DePalma on
Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.
LEED ID&C EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Dave Cale on
I am pursuing this credit under option 2. My client has bought a 9 story building and the project in question is for 2 partial floors and three full floors.
Existing Dining Facility Building v3 rating system
posted by Emily Wang on
I'm working on an existing Dining facility which has a significant amount of interior renovations and a small amount of NC, and exterior.
Certification agency meeting the ISO Guidelines
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Stephanie Graham on
Under the requirements of qualifying certification agencies, it reads, "The certification organization follows guidelines for environmental claims and third-party oversight, including ISO/IEC Guide
System Type 9 Baseline Fan Sizing
NC-2009 EAp2:Minimum Energy Performanceposted by Brian Kenney on
I am working on a job with the Army Corps of Engineers that has a vehicle maintenance workbay with general exhaust requirements of 1.5 CFM/SF dictated by the RFP.
Flush-Out Requirement for a Naturally Ventilated Building
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Eric Carbonnier on
The project is an 8 story residence hall on a university campus. The building is not equipped with a central ventilation system and dorm rooms rely on natural ventilation.
Clarifying 20 different materials from 5 different manufacturers
Schools-NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Cynthia Kaplan on
As I interpret the language of this credit, can I assume that I can submit say, three different types of ceiling tile from one manufacturer, and this would count as three different materials?
Metal Maintenance Cleaners
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Ryan Nelson on
Can someone assist and explain the best practice to assessing Metal Maintenance products for compliance with LEEDv2009? Does the product need to meet the low-VOC standards for Paints and Sealants?