Future Expansion

NC-2009 PIf2:Project Summary Details
posted by  Mary Kay  on 

We have a building under construction now for which we will pursue LEED certification.

1
Thu Jan 7, 2016, 4:36 pm

Substantial Completion, C of O, TCO

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Erika Duran  on 

Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in

1
Tue Dec 6, 2016, 9:38 pm

[Innovation Credit] Bicycle Alternative

Schools-EBOM-v4 INc1:Innovation
posted by  JOHN COOK  on 

Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.

1
Tue Jan 17, 2017, 8:30 pm

Application of the 1.67 allocation for the Option 1 & 2 combo

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Zane Lichtneger  on 

CIR ID#10410 allows projects to achieve SSc4.3 using a combination of Option 1 and Option 2.

1
Fri Feb 19, 2016, 4:44 pm

Incineration Option for Diversion Method

NC-v4 MRc5:Construction and demolition waste management
posted by  James Keohane  on 

1.Incineration may be considered "if reuse and recycling methods are not readily available"...........How will Reviewers define "readily available"? 2.

1
Mon May 8, 2017, 5:15 pm

ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Avery Colter  on 

I have a laundry room in a building which has no interior doors to other inhabited interior spaces, only an exterior door and exterior windows.

1
Thu May 5, 2016, 4:30 pm

Resuspension of particles from flooring?

EBOM-v4 EQp1:Minimum indoor air quality performance
posted by  Roger Lewis  on 

Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?

1
Tue Jul 25, 2017, 11:11 pm

Sharing my BD+C exam tips!

General forums
posted by  Paula Melton  on 

Hi, all! I wrote up my LEED AP BD+C exam tips in so much detail that we went crazy and decided to turn it into a study guide, workbook, and online practice exam!

0

Curtain Wall Should Be Exterior Wall or Glazing?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Sara Zoumbaris  on 

Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!

1
Wed Jan 18, 2017, 12:23 am

Where do I upload the response report for Design Final Package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Fri May 22, 2015, 1:34 pm