Future Expansion
NC-2009 PIf2:Project Summary Detailsposted by Mary Kay on
We have a building under construction now for which we will pursue LEED certification.
Substantial Completion, C of O, TCO
posted by Erika Duran on
Per the LEED certification Policy – we can submit construction review at Substantial Completion (defined as the date on which the building receives a Certificate of Occupancy or similar official in
[Innovation Credit] Bicycle Alternative
Schools-EBOM-v4 INc1:Innovationposted by JOHN COOK on
Hi, I was wondering if the innovation credit for V4 Existing Buildings can receive a point for using Electric Bicycle-Cars.
Application of the 1.67 allocation for the Option 1 & 2 combo
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Zane Lichtneger on
CIR ID#10410 allows projects to achieve SSc4.3 using a combination of Option 1 and Option 2.
Incineration Option for Diversion Method
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
1.Incineration may be considered "if reuse and recycling methods are not readily available"...........How will Reviewers define "readily available"? 2.
ASHRAE HVAC Apps Handbook Equation, Table 2, and Walls
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Avery Colter on
I have a laundry room in a building which has no interior doors to other inhabited interior spaces, only an exterior door and exterior windows.
Resuspension of particles from flooring?
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Roger Lewis on
Is there any LEED criteria for type of flooring that is necessary to prevent resuspension of particles from flooring into the indoor atmosphere?
Sharing my BD+C exam tips!
posted by Paula Melton on
Hi, all! I wrote up my LEED AP BD+C exam tips in so much detail that we went crazy and decided to turn it into a study guide, workbook, and online practice exam!
Curtain Wall Should Be Exterior Wall or Glazing?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Sara Zoumbaris on
Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.