Forum quick links
Innovation: WELL Features
NC-v4 INc1:Innovationposted by Laura Heagler on
This innovation credit awards a point for complying with WELL Feature 87: Beauty and Design.
Entryway Systems
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Lara Ibarra on
Hi everyone,
Legal Wood Pilot Credit and MR BPDO Sourcing of Raw Materials / Alternate Compliance Path
CI-v4.1 IN101:Innovationposted by John Masters on
Need some direction regarding the Legal Wood Pilot Credit & ACP - MR BPDO Sourcing Raw Materials
MR Credit: Optimized Building Products
posted by Carrie Havey on
BIFMA e3 / level - It’s not clear why Social Health & Equity is not included here. BIFMA level includes three prerequisites for Social Impacts: 8.1.1 Employee Health and Safety Management
LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your Space
NC-v4 INc1:Innovationposted by James Keohane on
Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First: Cleaning and Disinfecting Y
Historic Building Major Renovation - compliance with prescriptive Insulation and Air Barrier Requirements
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Colin Rohlfing on
Hello, there is a 160,000 SF historic building that will be doing a gut-rehab and has a masonry (brick) exterior that can't be altered.
Measuring TVOCs
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Rick Alfandre on
Has anyone ever used a device called the Airthings Wave Plus? We want to use it to report CO2 and TVOC numbers, but it reports TVOC's in ppb not ug/m3.
Purchasing - Lamps: EXIT signs
NC-v4 INc1:Innovationposted by Edgar Arevalo on
I'm having trouble finding lumens for EXIT signs that are to be included in the Lamp Purchasing calculator. Pretty much EXIT sign cutsheets do not show lumens because these are EXIT signs and
Case 2 Demand Response Capable Building with a "future" program
NC-v4.1 EAc4:Grid Harmonizationposted by Chris Flint Chatto on
Is case 2 only available to projects with utilities that don't have DR programs? under v4.0, this was clearly the case ("Case 2.
Arbitrage option
CS-v4 EAc5:Renewable energy productionposted by Glen Boldt on
When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form?