VOC Testing: Air Quality Sciences testing compliant with CDPH SM v1.1-2010?

CI-v4 EQc2:Low emitting materials
posted by  Kena David   on 

We are currently verifying that an insulation product would meet the Low Emitting Materials criteria.

2
Default Avatar
Berkeley Analytical (BkA)
LEEDuser Basic Member
2 thumbs up
Fri Apr 27, 2018, 10:43 am
6
Fri Apr 27, 2018, 5:28 am

Off-Site Parking

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Jeannie Rueter  on 

I'm working on a major remodel for a city-owned conference center that has no on-site parking. There is a city-owned parking garage near by. The conference center has 25 employees.

10
Thu Apr 26, 2018, 8:21 pm

University Campus Project

NC-v4 LTc5:Access to quality transit
posted by  Michele Helou  on 

We have a university academic building with a weekday schedule M-F.

13
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Apr 25, 2018, 6:11 pm

Weekday met, but no weekend service. Partial points?

CI-v4 LTc3:Access to quality transit
posted by  Matt Nicholson  on 

The bus service near our project clearly meets the weekday requirements, but there is no bus service on the weekends in Salem, OR.

2
Principal
Viridis Sustainable Building Consultancy LLC
LEEDuser Premium Member
15 thumbs up
Wed Apr 25, 2018, 6:06 pm

Watersense - Local Equivalents?

NC-v4 WEp2:Indoor water use reduction
posted by  Leanne Conrad  on 

Let's talk about watersense and local equivalents. 

6
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Tue Apr 24, 2018, 11:18 pm

Exterior composite wood covered?

NC-v4 EQc2:Low emitting materials
posted by  Craig Graber  on 

For non-HC or School projects, does this credit cover EXTERIOR composite wood? Credit requirements and Ref.

2
Tue Apr 24, 2018, 10:40 pm

Pneumatic Controls - Monitoring Based Cx

CI-v4 EAc1:Enhanced commissioning
posted by  Christopher Lim  on 

I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.

0

Confirm: Tenant WE calc can include Base Building rainwater system

CI-v4 WEp1:Indoor water use reduction
posted by  Brian Salazar  on 

Hello!  I have a CI project where the tenant occupies multiple contiguous floors.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Apr 20, 2018, 2:13 am

ASHRAE 50% AEDG

CI-v4 EAc2:Optimize energy performance
posted by  AMY VAN DAM  on 

Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 19, 2018, 9:00 pm