Forum quick links
Forum
Topic
Replies
Recent
How to model HVAC system in Baseline model for Group approach Project
NC-2009 EAp2:Minimum energy performanceposted by soham babu on
Hi All,
1
Wed Aug 8, 2018, 3:40 pm
Regional Prioroty credit RPc1
NC-v4 RPc1:Regional priorityposted by Randall Beatty on
What is available under EAc1 for a regional priority credit for Fort Huachuca, Arizona?
1
Mon Oct 15, 2018, 8:02 pm
Showing Task Lighting for Work Stations on Drawings
NC-2009 IEQc6.1:Controllability of systems - lightingposted by Josie Plaut on
Hi,
1
Tue Aug 7, 2018, 3:32 pm
Long ribbon window considered for View Type 1
NC-v4 EQc8:Quality viewsposted by Khue Nguyen on
Out project has multiple ribbon windows along the entire perimeter walls. Is this condition eligible for View type 1?
0
Melamine-Urea-Formaldehyde
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Bobby White on
Hi, I've been asked if our products contain "Melamine-Urea-Formaldehyde".
2
Fri Aug 3, 2018, 6:11 pm
Exterior lighting requirements - BUG method?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Erica Downs on
Hello - does anyone know if this credit can be achieved via the BUG method v4 option? Or must the requirements be met with a photometric plan? Seems silly to have to do v3 documentation
0
Interior lighting requirements?
Pilot-Credits SSpc55:Bird collision deterrenceposted by Erica Downs on
Hello - Clarification question...
1
Thu Aug 2, 2018, 7:48 pm