water sense equivalent for a project with modular rooms made overseas
Hospitality-NC-v4 WEp2:Indoor water use reductionposted by Gail Napell on
Hi all
Does the independent lab we use need to be accredited for compliance with ISO/IEC Standard 17025?
NC-v4 SSc5:Heat island reductionposted by Ashley O'Neill on
Will a testing report be rejected if the lab follows CRRC-1 but is not an ISO/IEC Standard 17025 lab?
Pilot Program 55, Bird Collision Deterrence
NC-v4 INc1:Innovationposted by Lauren Luckowski on
All:
To Parksmart or Not
posted by Kim Shinn on
Our project is a single building - an office building built atop a parking structure. Has anyone done a pro/con analysis of whether 'tis better to include the parking structure in the LEED bo
Wastewater Plant Methane-powered Fuel Cell
CI-v4 EAc4:Renewable energy productionposted by on
I have a project on a campus whose microgrid is in part served by a large fuel cell. The fuel cell is powered by waste methane gas purchased from a nearby wastewater treatment plant.
Reporting Clarification for Waste Hauler/Transfer Station
NC-v4 MRc5:Construction and demolition waste managementposted by Melissa Johnston on
Hello,
I work for a hauling company/transfer station and am a LEED Green Associate.
Building Type not listed in Default Occupancy Table
NC-v4 LTc6:Bicycle facilitiesposted by Tim Nabholz on
I am working on a justice centre (court house) project here in Canada and am wondering which occupancy type to use.
Target Finder
NC-v4 EAc2:Optimize energy performanceposted by Edgar Arevalo on
I am working on a sanitation maintenance garage, which is a major renovation project, and I plugged the necessary info at EPA Target Finder.
Fan power in Baseline
NC-v4 EAp2:Minimum energy performanceposted by Tanushree Charan on
I wanted to understand what is the ballpark for the fan energy consumption for the ASHRAE 90.1 Baseline model for LEED v4.
A great way for 2009 projects to bridge the gap to version 4
Pilot-Credits MRpc84:v4 MR credit category for v2009 projectsposted by Elizabeth Powers on
I'm just adding a comment here to participate in the forum per the pilot requirements. Our project pursued this option as a great way for one of the last 2009 projects to be built on a campus