P-Patch as Non-Adjacent Open Space for Municipal Owner

NC-v4 SSc3:Open space
posted by  Teresa Stern  on 

We have a municipal building that won't likely comply with the open space area needed based on the project site area alone. However there is a City-owned P-Patch nearby.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Wed Jan 23, 2019, 8:21 pm

Additions to Existing Cold Storage Facility

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Dustin Norton  on 

I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.

2
Sustainability Program Manager
Primus Design Services, LLC
LEEDuser Premium Member
40 thumbs up
Wed Jan 23, 2019, 7:49 pm

Case 2 Option 2C

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Patrick Cellie  on 

I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system. 

3
Default Avatar
Sustainability Consultant
AECOM
LEEDuser Basic Member
0 thumbs up
Tue Jan 22, 2019, 9:14 pm

How to calculate multi-level Decks / Patios

NC-v4 SSc5:Heat island reduction
posted by  Sara Hickman  on 

The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself).

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue Jan 22, 2019, 8:39 pm

Construction and Demolition Waste Management Plan – Sample

CI-v4 MRc6:Construction and demolition waste management
posted by  milo valenti  on 

Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?

3
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Tue Jan 22, 2019, 7:51 pm

Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Todd Bundren  on 

Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?

0

Intermittent ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Dustin Smith  on 

Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?

0

waste generated from new construction

Mid-Rise-v4 MRc3:Construction waste management
posted by  sue bryant  on 

If you are removing an existing building, can the waste from the building be counted if you are recycling it?

4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Tue Jan 22, 2019, 8:21 am

On-site or off-site separation

Homes-v4 MRc3:Construction waste management
posted by  Amrit Kaur  on 

The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.

2
Senior Director
Linnean Solutions
LEEDuser Expert
2 thumbs up
Tue Jan 22, 2019, 6:27 am

Option 2 - Excluding Demo

NC-v4 MRc5:Construction and demolition waste management
posted by  Nathan Gauthier  on 

The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie

17
Default Avatar
Mission Green Buildings
LEEDuser Basic Member
0 thumbs up
Mon Jan 21, 2019, 10:25 pm