P-Patch as Non-Adjacent Open Space for Municipal Owner
NC-v4 SSc3:Open spaceposted by Teresa Stern on
We have a municipal building that won't likely comply with the open space area needed based on the project site area alone. However there is a City-owned P-Patch nearby.
Additions to Existing Cold Storage Facility
NC-v4 EAp1:Fundamental commissioning and verificationposted by Dustin Norton on
I am working on a project that includes a large existing cold storage facility that will essentially double in size after renovations.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
How to calculate multi-level Decks / Patios
NC-v4 SSc5:Heat island reductionposted by Sara Hickman on
The project will have several patios / decks throughout, many of which will be covered by a large cantilever above (being the building itself).
Construction and Demolition Waste Management Plan – Sample
CI-v4 MRc6:Construction and demolition waste managementposted by milo valenti on
Construction and Demolition Waste Management Plan – Sample Are there template sample form in Excel format for our recycling yard?
Schools - 2009 IEQp3 - STC requirement between Computer Lab and Elevator Shaft
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Todd Bundren on
Does anyone know what the STC requirement is for a partition that separates a computer lab and an elevator shaft?
Intermittent ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dustin Smith on
Has anyone successfully used scheduled intermittent ventilation for a constant-volume exhausted space to avoid overventilation, and to minimize energy usage, in a warehouse or similar space?
waste generated from new construction
Mid-Rise-v4 MRc3:Construction waste managementposted by sue bryant on
If you are removing an existing building, can the waste from the building be counted if you are recycling it?
On-site or off-site separation
Homes-v4 MRc3:Construction waste managementposted by Amrit Kaur on
The credit general requirement requires a percentage of material recycled, and a formal report indicating how much was recycled and to what purpose.
Option 2 - Excluding Demo
NC-v4 MRc5:Construction and demolition waste managementposted by Nathan Gauthier on
The credit language says "do not generate more than 2.5 pounds of construction waste..." but the example Equation 2 shows "Total construction AND DEMOLITION waste generated..." Has anybody clarifie