Occupancy date for Core and Shell
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Edgar Arevalo on
Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established. Should I just wait til we get the first tenant occupancy d
Option 1 Noncompliant Lights are Being Phased Out
EBOM-v4 SSc4:Light pollution reductionposted by Justin Schwartz on
Good afternoon everyone,
Ventilation Requirement for High Rise Residential
NC-v4 EQp1:Minimum indoor air quality performanceposted by Jay Murray on
Question: Is it necesary to hard duct ventilation air into each bedroom within the apartment?
Interior Partitions Option 2: Strategy F without movable partitions?
NC-v4 EQc6:Interior lightingposted by Cindy Quinn on
Has anyone had success earning Interior Lighting Option 2: Strategy F with a project that doesn't have movable partitions? Our project was denied this strategy because we don't have movable p
Definition of Inpatient Units
Healthcare-v4 MRc8:Design for flexibilityposted by Neumann Monson on
Our project is a Behavioral Health Community Access Center. We're considering using the Horizontal Expansion option under design for flexibility.
Building-level energy metering
NC-v4 EAp3:Building-level energy meteringposted by Tim Hemsath on
How does USGBC enforce the commitment to sharing with USGBC the resulting energy consumption data and electrical demand data (if metered)...
v4_Low Emitting Materials Calculator
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Thomas Bennett on
I am trying to fill out this LEED calculator for the 5 HVAC materials that we are using on a project, 440 Gasket Tape, Duct Sealant DP1015, Oatey No 5.
Mandatory Requirements and Applicable Exceptions: Section 8.1.5
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
In a LEED v4 CI project, we have a floor that will architecturally stay the same. New HVAC and new lighting fixtures (same ceiling and placement though).
Interior Reuse - shared walls with other businesses
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lou Niles II on
Hello Can anyone give some advice on including Both sides or one side of interior walls for a Tenant Improvement where the other side of the wall is a space not in the scope.
Modeling Electric Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hi,