European testing methods for US projects

NC-v4 EQc2:Low emitting materials
posted by  Kavita K  on 

Can US projects use products which show compliance with VOC emissions requirement through AgBB (European) testing? Or does it need to be CDPH only. 

2
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Tue Aug 27, 2019, 9:45 am

FPL OnCall in South Florida

NC-v4 EAc4:Demand response
posted by  Joseph Snider  on 

In South Florida, our local utility, Florida Power & Light (FPL), has a program call Business On Call.  They set it up so they can turn off your A/C for short periods of time..."up to 17.5

1
Fri Aug 23, 2019, 8:40 pm

Approved Bicycle Storage

NC-v4 LTc6:Bicycle facilities
posted by  Summer Minchew  on 

I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.

4
Default Avatar
Green Building Consultant
LEEDuser Basic Member
20 thumbs up
Thu Aug 22, 2019, 3:22 pm

PIf2 Site Characteristics for individual building project on a LEED Campus

Schools-2009 PIf2:Project Summary Details
posted by  Yasha Ogg  on 

I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building.

0

How long after a project is completed can credits be submitted?

Healthcare-v4 INc1:Innovation
posted by  Stephanie Kreps  on 

If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?

0

Are Shades 'Furniture and Furnishings'?

CI-v4 EQc2:Low emitting materials
posted by  Julie Hendricks  on 

Motorized  and manual shades (such as Mechoshade) are in Division 12.  Do they count as "stand-alone furniture items" that must be included in low-emitting materials calculations?

4
Mon Aug 19, 2019, 3:58 pm

Appeal for denied credit

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Johnathan Woodside  on 

If a project has been submitted for review (Design prelim and Construction prelim) comments are received for each review.

13
Thu Aug 15, 2019, 7:24 pm

Adding Green Energy points after final construction review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susan Di Giulio  on 

So we have a difficult v2009 project that strained to achieve simple certification. It came back from prelim construction review with only one comment.

2
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Thu Aug 15, 2019, 7:02 pm

exceptions for farmland?

NC-v4 LTc2:Sensitive land protection
posted by  Erica Downs  on 

We have an infill site on a university campus.  Unfortunately, this particular plot of land was previously undeveloped.  When checking the soils survey site, a portion of the site comes u

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Thu Aug 15, 2019, 6:02 pm