Comingled waste on site - separation at waste facility

CS-v4 MRc5:Construction and demolition waste management
posted by  Alicia Ravetto  on 

Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit?

4
CPC, LEED AP BD+C
Durotech, Inc.
LEEDuser Basic Member
3 thumbs up
Thu Oct 3, 2019, 9:31 pm

Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction", Option #4 - LCA tools recommended.

NC-v4 MRc1:Building life-cycle impact reduction
posted by  RICHARD ABRAHAMS  on 

I am pursuing Option #4 for the Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction".

1
Tue Oct 1, 2019, 8:33 pm

When is a CAPP Plan not a LEED conforming Plan?

NC-v4 SSp1:Construction activity pollution prevention
posted by  Harry Flamm  on 

We are building a high-rise residential building in a tight urban (Boston) site that is under 1-acre in size.

2
Tue Oct 1, 2019, 1:44 pm

47 Serving sizes

WELL v1 Building Standard Tip Sheet
posted by  Carina Clark  on 

Clarification needed for 47 Serving sizes: On Part 2: Dishware d. Cups are no larger than 473 mL [16 oz]. Does this include both coffee/tea mugs as well as water glasses?

2
LFA, RESET ASP, WELL Faculty, LEED Fellow
Wight & Company
LEEDuser Expert
6 thumbs up
Mon Sep 30, 2019, 9:28 pm

v4 Compliant Stadium/Athletic Field Lighting

NC-v4 SSc6:Light pollution reduction
posted by  Peter Doo  on 

Does anyone know of a manufacturer for v4 compliant athletic field lighting.

1
Mon Sep 30, 2019, 8:06 pm

Overall Approach to LEED Application Process

EBOM-v4.1 EAp1:Energy Efficiency Best Management Practices
posted by  Colin Hulyk  on 

I have done quite a bit of research on the GBCI website and looked at the LEED requirements, but I am still having a difficult time figuring out the overall scope of applying for LEED certification

1
Mon May 10, 2021, 8:58 pm

Option 3 flexible lighting control system required documentation

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Alara Brinton  on 

I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.

3
Thu Sep 26, 2019, 9:21 am

Water Restoration Certificates

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Renee Azerbegi  on 

This is a straight forward pilot credit with benefits beyond the project boundary to various watersheds. I recommend projects pursue it.

1
Fri Feb 18, 2022, 6:28 pm

Submit Option 2 for a base building with certification pending??

CI-v4.1 IPc1:Integrative Process
posted by  Erica Downs  on 

Our CI project would like to follow v4.1 Option 2: Select a LEED Certified Building.  The CI project is located in a LEED-registered C&S project, but the base building is sti

1
Thu Oct 17, 2019, 3:57 am