Is anyone providing ergonomic keyboard and mouse?

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Anthony Stark  on 

Our approach is to provide sit stand desks, adjustable chairs and adjustable monitor arms.  We are not providing ergonomic computer input devices such as mouse and keyboard unless medically re

0

Calculator's "Zone Discharge Airflow" for a Core & Shell Building

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Todd Tewksbury  on 

We are looking to achieve the v4 Minimum Indoor Air Quality Performance credit for an 11-story core and shell office building.  The building will be conditioned by central VAV AHUs (which are

1
Tue Oct 5, 2021, 8:22 am

Calculating total materials cost

NC-2009 MRc4:Recycled Content
posted by  Edgar Arevalo  on 

So far, the materials that are included in the speadsheet calculator reflect CSI division 3-10.  And yet we have to account for Divisions 3-10, 31, and 32 when calculating the total mater

1
Wed Oct 16, 2019, 5:45 pm

Data center load calculation

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Eshagh Yazdanshenas  on 

I have a data center with 1500 kW nameplate power. I've seen that there are two different diversity factor and usage factor to calculate the total yearly electricity consumption of data center.

0

Comingled waste on site - separation at waste facility

CS-v4 MRc5:Construction and demolition waste management
posted by  Alicia Ravetto  on 

Is this always considered a single stream? What method of documentation should the waste facility provide to comply with the requirement of this credit?

4
CPC, LEED AP BD+C
Durotech, Inc.
LEEDuser Basic Member
3 thumbs up
Thu Oct 3, 2019, 9:31 pm

Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction", Option #4 - LCA tools recommended.

NC-v4 MRc1:Building life-cycle impact reduction
posted by  RICHARD ABRAHAMS  on 

I am pursuing Option #4 for the Whole Building Life Cycle Assessment for MR Credit "Building Life-Cycle Impact Reduction".

1
Tue Oct 1, 2019, 8:33 pm

When is a CAPP Plan not a LEED conforming Plan?

NC-v4 SSp1:Construction activity pollution prevention
posted by  Harry Flamm  on 

We are building a high-rise residential building in a tight urban (Boston) site that is under 1-acre in size.

2