Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Using Credits from Rating System Other than LEED as ID Credits

NC-v4 INc1:Innovation
posted by  Kathleen Gaffney  on 

I tried to find whether or not this question had been asked on the LEED v3 or LEED v4 comment thread but nothing seemed to rise to the surface.

5
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Tue May 12, 2020, 2:01 pm

"20 Different permanently installed products"

NC-v4.1 MRc2:Environmental Product Declarations
posted by  James Keohane  on 

Question about how to apply the requirement for "20 different pemanently installed products"?  Can I for example use more than one paint type from Sherwin Williams?  Pushing the thought f

1
Tue May 12, 2020, 2:30 am

Occupant Comfort Survey and Students

Schools-NC-v4 INc1:Innovation
posted by  Bryna Dunn  on 

In v4, the innovation credit language states: "The responses must be collected from a representative sample of building occupants making up at least 30% of the total occupants."  In past versi

2
President
Doo Consulting LLC
LEEDuser Basic Member
136 thumbs up
Mon May 11, 2020, 8:12 pm

Borrowing credit from Homes Design and Cronstruction

NC-v4 EAc5:Renewable energy production
posted by  Michael J Turner  on 

Hello,

We are using LEED V4 BD+C, and we achived a credit listed within the LEED Homes Design and Construction; specifically the EA Credit: Active Solar-Ready Design.

1
Mon May 18, 2020, 2:26 pm

MRpc109: Building Material Human Hazard & Exposure Assessment - Documentation

Pilot-Credits MRpc109:Building Material Human Hazard & Exposure Assessment
posted by  Becky Baumer  on 

Hello.  I am gathering data to submit for this pilot credit.  What have you found to be the best method to document that there has been a validated Hazard Assessment on the product? 

1
Wed Apr 21, 2021, 8:47 am

Achieving credit ( 1 Innovation point?) for having a Green Cleaning Policy with a NC K-12 School Project

NC-v4.1 INc1:Innovation
posted by  Michael McDonald  on 

A few years back on NC Projects Achools were able to achieve 1 Innovation Point on NC Projects by Implementing a Green Cleaning Policy.

0

Changing Total Gross Floor Area in PIf2 during Preliminary Design Review

NC-2009 PIf2:Project Summary Details
posted by  Edgar Arevalo  on 

I'm currently going through the preliminary design review credits, and I was stumped on the comment for IEQp1: Minimum Indoor Air Quality Performance surrounding the 40,198 sq. ft.

1
Fri Jun 5, 2020, 4:41 pm
2
Tue Apr 28, 2020, 5:36 am