Forum quick links
What counts in terms of "conditioned space"?
Healthcare-v4 SSc7:Places of respiteposted by Garrett Ferguson on
What types of conditioned spaces count towards places of respite? I'm assuming break rooms, waiting rooms, and sim?
Average daily visitors calculation
CI-v4 WEp1:Indoor water use reductionposted by Émilie Cormier on
Hi,
Extraction distance to factory and distance from factory to construction site.
NC-2009 MRc5:Regional Materialsposted by cedric grenier on
Hi, I'm having a little bit of trouble understanding exactly what distance they're asking for. It may sound like a bad question but it's an itch I need to scratch.
FAR of a retail unit within a Multi-Use Building
ND-Plan-v4 NPDc2:Compact developmentposted by Tim Nabholz on
Is there another way to count the FAR of retail in multi-storey building with residential above?
Off-site renewables calculated in Optimized Energy Performance in LEED v4
NC-v4 EAc2:Optimize energy performanceposted by Deb Favaretto on
Hi,
Dimensional Lumber - category
NC-v4 EQc2:Low emitting materialsposted by Chyanne Husar on
Does dimensionable lumber used for blocking or support for interior wall partitions considered part of materials to be evaluated for LEM compliance?
Thermal comfort for LEED Airports
NC-v4 EQc5:Thermal comfortposted by Mackenzie Anderson on
I am trying to find any official information on exceptions/modifications for LEED certifications for airports.
Number of Commissioning Agents
posted by Dola Onajin on
Is it okay to have more than one independent commissioning agent on a project?
Option 2/ Strategy E- Casework Included?
Retail-NC-v4 EQc6:Interior lightingposted by LUCY WILLIAMS on
Our "walls" have casework installed from finished floor to 36" above finished floor (since this is a retail space). Is the casework LRV (light reflectance value) to be included in the ca
Supporting Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
While the LEEDonline form does not specifically list this as a requirement, I have always uploaded the waste tickets/receipts as supporting documentation along with the MR CWM calculator