Forum quick links
Dimensional Lumber - category
NC-v4 EQc2:Low emitting materialsposted by Chyanne Husar on
Does dimensionable lumber used for blocking or support for interior wall partitions considered part of materials to be evaluated for LEM compliance?
Thermal comfort for LEED Airports
NC-v4 EQc5:Thermal comfortposted by Mackenzie Anderson on
I am trying to find any official information on exceptions/modifications for LEED certifications for airports.
Number of Commissioning Agents
posted by Dola Onajin on
Is it okay to have more than one independent commissioning agent on a project?
Option 2/ Strategy E- Casework Included?
Retail-NC-v4 EQc6:Interior lightingposted by LUCY WILLIAMS on
Our "walls" have casework installed from finished floor to 36" above finished floor (since this is a retail space). Is the casework LRV (light reflectance value) to be included in the ca
Supporting Documentation
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Minchew on
While the LEEDonline form does not specifically list this as a requirement, I have always uploaded the waste tickets/receipts as supporting documentation along with the MR CWM calculator
Lighting controls inside a dorm restroom
NC-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
Section 9.4.1.2 Space Control indicates that restrooms must have an occupancy sensor. We have a dorm project where each two dormrooms has a shared bathroom.
Photos of Views
NC-v4 EQc8:Quality viewsposted by Summer Minchew on
Has anyone been successful in achieving this credit using photos as documentation to demonstrate view type compliance?
Innovation Design credits for a Construction Review
NC-v4 INc1:Innovationposted by Summer Gorder on
We would like to add the architects JUST certification for an innovation point, but it requires us to open to update.
Renewable Energy Production
NC-v4.1 EAc5:Renewable Energyposted by Jeff Forward on
NC v4.1 talks about offsetting a percentage of greenhouse gas emissions. How are GHG's calculated?
Proving Savings for a Utility-Owned Power Plant
NC-v4 EAc2:Optimize energy performanceposted by Michael Hill on
I am wondering if anyone has any thoughts on how/if energy savings could be demonstrated for a Utility-Owned Electric Power Plant (just the plant itself).