Forum quick links
EV parking space distribution
NC-v4.1 LTc8:Electric Vehiclesposted by Nadia Bini on
Our project has both employee parking and visitor parking.
Dedicated Kitchen Exhaust
NC-v4 EQp1:Minimum indoor air quality performanceposted by colleen soden on
We have a low rise (4 story) multifamily residential project considering LEED v4 BD+C in Boston.
Outside Temperature Adjustment Factor
EBOM-v4.1 EAp3:Energy Performanceposted by Julie Hendricks on
The calculation for determining the outside temperature adjustment factor in the GHG emissions score calculation seems to be missing from the credit langauge, both here at LEEDuser and in the LEED
How to validate applicability of Tier 2 & 3 RECs
NC-v4.1 EAc5:Renewable Energyposted by Joyce Kelly on
An organization contracts with a local utility to exclusively purchase energy from renewable sources for 20 yrs.
Project relocated to a new site
NC-v4 IPc1:Integrative processposted by Sara Goenner Curlee on
I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1
USGBC approved equivalent to EPA registered pesticides
Homes-v4 SSc3:Nontoxic pest controlposted by Sam Badach on
I am preparing the O&M manual as part of credit Non-toxic Pest Control for LEED V4 for Homes.
Enhanced Refrigerant Management - TRANE Calculator Issues
NC-v4 EAc6:Enhanced refrigerant managementposted by Daniel Davis on
Project: 3-story student housing in Danville, KY
EA Green Power and Carbon Offsets Credit: What if project net zero; solar panels?
Schools-NC-v4 EAc7:Green power and carbon offsetsposted by LJ Bryant on
Hello! I am working on a school project that is net zero (all energy offset by solar panels on site).
Option 1 Path 2 - What's Been Your Experience?
NC-v4 EQc4:Indoor air quality assessmentposted by Cynthia Kaplan on
Hi all,
Show of hands for those that have used Option 1, Path 2, post occupancy flush out:
Do you provide trending data for both phases, or just the preliminary phase?