EV parking space distribution

NC-v4.1 LTc8:Electric Vehicles
posted by  Nadia Bini  on 

Our project has both employee parking and visitor parking.

1
Wed Nov 11, 2020, 9:49 pm

Dedicated Kitchen Exhaust

NC-v4 EQp1:Minimum indoor air quality performance
posted by  colleen soden  on 

We have a low rise (4 story) multifamily residential project considering LEED v4 BD+C in Boston.

4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Wed Nov 11, 2020, 10:59 am

Outside Temperature Adjustment Factor

EBOM-v4.1 EAp3:Energy Performance
posted by  Julie Hendricks  on 

The calculation for determining the outside temperature adjustment factor in the GHG emissions score calculation seems to be missing from the credit langauge, both here at LEEDuser and in the LEED

1
Wed Jun 15, 2022, 9:58 pm
4
Thu Nov 5, 2020, 8:34 pm

How to validate applicability of Tier 2 & 3 RECs

NC-v4.1 EAc5:Renewable Energy
posted by  Joyce Kelly  on 

An organization contracts with a local utility to exclusively purchase energy from renewable sources for 20 yrs.

1
Thu Nov 19, 2020, 6:38 pm

Project relocated to a new site

NC-v4 IPc1:Integrative process
posted by  Sara Goenner Curlee  on 

I have a project that just completed the IP credit requirements before the end of SD, and now finds itself likely needing to relocate to a different site. The proposed new site is about 1

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4459 thumbs up
Wed Nov 4, 2020, 7:21 pm

USGBC approved equivalent to EPA registered pesticides

Homes-v4 SSc3:Nontoxic pest control
posted by  Sam Badach  on 

I am preparing the O&M manual as part of credit Non-toxic Pest Control for LEED V4 for Homes.

0
1
Wed Dec 2, 2020, 12:24 am

EA Green Power and Carbon Offsets Credit: What if project net zero; solar panels?

Schools-NC-v4 EAc7:Green power and carbon offsets
posted by  LJ Bryant  on 

Hello! I am working on a school project that is net zero (all energy offset by solar panels on site).

1
Thu Oct 29, 2020, 5:31 pm

Option 1 Path 2 - What's Been Your Experience?

NC-v4 EQc4:Indoor air quality assessment
posted by  Cynthia Kaplan  on 

Hi all,

Show of hands for those that have used Option 1, Path 2, post occupancy flush out:

Do you provide trending data for both phases, or just the preliminary phase?

0