Forum quick links
Low Emitting Materials Calculator
NC-v4 EQc2:Low emitting materialsposted by Lawrence Rennell on
The LEED V4 guidebook states under the bold headline: Additional VOC content requirements for wet applied products.
Irrigated areas and vegetated non-irrigated areas - How to include in calculator?
NC-v4 WEp1:Outdoor water use reductionposted by Erica Downs on
The reference guide's step-by-step language says:
Landscaping near the facade
Pilot-Credits SSpc55:Bird collision deterrenceposted by Michelle Halle Stern on
One of my teammates has raised a concern that we aren't eligible for this credit if plantings are located near the facade. I don't see any mention of that requirement in the credit language.
Education Session/Survey Requirement in LEED v4 Projects
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Brad Newkirk on
I am working on a LEED-CI v4 project that has registered for this Pilot Credit.
For submittal requirements in the USGBC Pilot Credit Library it lists that projects will need to provide:
LEED Innovation: WELL Features
NC-v4 INc1:Innovationposted by Dola Onajin on
1. Was LEED Innovation: WELL Features ever a pilot credit? If so, when and under what version?
2. When did it become an innovation credit?
General Emissions Evaluation criteria for flooring assemblies assembled off-site
NC-v4 EQc2:Low emitting materialsposted by Jeff Wiedmeyer on
I've read through the posts related to this subject but for laminating adhesives and millwork. My question is similar but pertains to the requirement for a flooring assembly assembled off sit
LEED v4 credit coach?
posted by Lawrence Rennell on
I have heard that there is credit coaching available for LEED v4 credits, however, finding a way to contact this individual is on the same level as making contact with Bigfoot.
Safety First Pilot Credits - Additional Innovation Points
posted by Cynthia Kaplan on
We have a project that has already claimed 4 of the 5 innovation points available. We would like to utilize at least 2 of the Safety First pilot credits.
Default contract length for renewable energy procurement
NC-v4.1 EAc5:Renewable Energyposted by Bryna Dunn on
Under the definitions of Tier 1, Tier 2, and Tier 3, there is a statement that reads: "The default contract length for renewable energy procurement is 10 years.
RPT Section 470 (Green Building LEED Improvement Exemption)
posted by Ray Capone on
Hello,