Forum quick links
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.
Inconsistent Price Square Meters versus Square Feet
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Ben Stanley on
We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu
Withered grass
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Gustavo De las Heras Izquierdo on
Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.
Lavatories in special conditions
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Vanessa Montezuma Ramos on
Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
supplier and products UF
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Jose Antonio Kovacevic on
To comply with IEQc4.4 credit in LEED NC It has been evaluated local furniture suppliers of MDF, used for new buildings and the most regular composite woord and agrifiber for new buildings. In Peru
Extraction Monoxide in Basement During Construction
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Alan Viale on
we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?
Vertical fenestration for Proposed Case
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello, I'm evaluating the energy efficiency of a building that has almost 100% of curtainwall, however the architect says that his project has high beams height (the ones attached to the exterior
Scope of system performance testing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Billy Condor on
I have two questions regarding Cx activities for a LEED CI proyect: 1.