Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Scope in a C&S shopping mall

CS-2009 EAp2:Minimum Energy Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.

1
Fri Jun 19, 2015, 4:58 pm

Inconsistent Price Square Meters versus Square Feet

Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protection
posted by  Ben Stanley  on 

We're pursuing this pilot credit for an EBOM project and it looks like the stated price for financial support is inconsistent if your reporting site area in square meters ($0.5 /square meter) versu

0

Withered grass

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Gustavo De las Heras Izquierdo  on 

Our client has planted a mixture of grass species in a vegetated area. Some of the species have withered and only one has remained and keeps growing.

1
Fri Nov 27, 2015, 3:13 am

Lavatories in special conditions

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vanessa Montezuma Ramos  on 

Hello everyone! I am currently working on a project for a university campus. This is a three story building, with laboratories for students and researchers.

1
Mon Jul 10, 2017, 6:27 pm

Scope of the Pre-requisite in C&S Shopping mall

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Alan Viale  on 

We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.

1
Tue Jun 30, 2015, 8:19 pm

supplier and products UF

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Jose Antonio Kovacevic  on 

To comply with IEQc4.4 credit in LEED NC It has been evaluated local furniture suppliers of MDF, used for new buildings and the most regular composite woord and agrifiber for new buildings. In Peru

0

Extraction Monoxide in Basement During Construction

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  Alan Viale  on 

we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 17, 2017, 7:09 pm

Laboratory

NC-v4 WEp2:Indoor water use reduction
posted by  Vanessa Montezuma Ramos  on 

My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 9, 2017, 3:13 pm

Vertical fenestration for Proposed Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Billy Condor  on 

Hello, I'm evaluating the energy efficiency of a building that has almost 100% of curtainwall, however the architect says that his project has high beams height (the ones attached to the exterior

3
Fri Jan 27, 2017, 5:41 pm

Scope of system performance testing

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Billy Condor  on 

I have two questions regarding Cx activities for a LEED CI proyect: 1.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Jan 26, 2017, 9:07 pm