Forum quick links
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
Registration by Owner or Consultant?
NC-2009 PIf2:Project Summary Detailsposted by Vanessa Montezuma Ramos on
I am not sure if I am in the correct subject, but I did not find any answer or forum subject regarding this particular matter.
Building Level Water Metering
EBOM-v4 WEp2:Building-level water meteringposted by sebastian castañeda on
I have a doubt, we have a project of a complex of 3 buildings that is located inside a University Campus.
a one-family House can be LEED EBOM?
EBOM-2009 PIf2:Project Summary Detailsposted by Alan Viale on
Hi, we have a house for one-family with the interest to be a LEED EBOM. is this possible? all the credits which require measurement, verification, or following can be responsible of the family o
ESC Plan equivalent
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Vanessa Montezuma Ramos on
Hi, we have some doubts about the equivalency of the ESC plan according to our local standards.
Outdoor Air Delivery Monitoring System for LEED CS building
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Ron Dean on
We have a leased office in a LEED C&S project.
Extraction Monoxide in Basement During Construction
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Alan Viale on
we have a project of 20 floors of offices; and has 10 parking basements by local regulations. The design of parking in basements requires extraction monoxide. Currently is under construction and h
Laboratory
NC-v4 WEp2:Indoor water use reductionposted by Vanessa Montezuma Ramos on
My project is an Investigation Center which has laboratories. The lavatories found in the lab area (chemistry) should be considered in this credit?
Vertical fenestration for Proposed Case
NC-2009 EAp2:Minimum Energy Performanceposted by Billy Condor on
Hello, I'm evaluating the energy efficiency of a building that has almost 100% of curtainwall, however the architect says that his project has high beams height (the ones attached to the exterior
Scope of system performance testing
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Billy Condor on
I have two questions regarding Cx activities for a LEED CI proyect: 1.