Forum quick links
Interesting Credit and my experience
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Esteban Martinez on
This has been my fourth time working with this credit and while I must admit is a pretty interesting credit that seeks to implement design strategies and relate them to health/comfort of the occupa
COVID-19 restrictions alternative documentation path
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Esteban Martinez on
Hello,
Quality views in nonregularly occupied spaces
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by Angela Atehortua on
We are currently undertaking a project for a Bank located in the city of Cali, Colombia, this is an office building located in which its premise is to comply with sustainability and bioclimatic cri
Projects with no associated off-street parking
CS-v4 LTc7:Reduced parking footprintposted by Esteban Martinez on
The team has the following doubt: at the LEED guide says that the project allowable parking must be less or equal to minimum code, but then says that if the project is not associated to off-street
Graded Site - Previously Developed Site
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Pedro Julio Silva Perez on
For a Distributuion Center project located in an industrial park , the developer enhanced the mechanical soil properties through grading the whole site area.
Strategy to fulfill the pilot credit Quality views in non regularly occupied spaces
NC-v4 EQc8:Quality viewsposted by Angela Atehortua on
In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all space
Natural Ventilation Procedure - Prescriptive Path 62.1 2010
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
Direct vs indirect measurements
NC-2009 EAc5:Measurement and Verificationposted by Cesar Ruiz on
Hi everyone, We are working on a Residential New Construction Project, compound of more than 100 apartments, pursuing Option D - Calibrated Simulation.