Does restrooms exhaust can comply with the prerequisite requirements in a residential building?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Felipe Duran on
Dear All,
We are working on a naturally ventilated residential project with 295 dwelling units. The project comply with the monitoring requirements.
Vegetated roofs for Places of Respite Credit
Healthcare-v4 SSc7:Places of respiteposted by María Fernanda Aguirre on
Hello everyone: There is a huge hospital in Chile which is in design phase and wants to pursue LEED.
Fresh air needs in server rooms for data center
Data-Centers-NC-v4 EQp1:Minimum indoor air quality performanceposted by Jose Antonio Kovacevic on
Hello,
In order to assess compliance of a Data Center with prerrequisite EQp1 and credit EQc1, I would like to know how we should calculate fresh air needs for the server rooms.
Polyvalent Chiller Efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Francisca Herrera on
Hi, I hope you can help me with my query.
In a project in process of certification LEED v2009, we are evaluating the efficiency of a polyvalent chiller.
Substantial differences between the CGP from 2012 as required in LEED V4?
NC-v4 SSp1:Construction activity pollution preventionposted by veronica oyarzun on
Can anyone please tell me how different should be documenting this credit comparing with LEED 2009?
ISO 50001 ACP
EBOM-v4 EAp1:Energy efficient best management practicesposted by veronica oyarzun on
For LEED EBOM 2009 there are ACP´s available through the ISO 50.001. How does it works for v.4?
Non Local Supplier
CS-2009 MRc6:Certified Woodposted by Jose Antonio Kovacevic on
Hi, We have a non local supplier.
MR credit: Building Disclosure
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Francisca Herrera on
In relation to the Educational Session on EPD that you lead through USGBC, can you please tell me if the EPD compliant with LEEDv4 that you cover through this course, requires that the program unde
100% On site Infiltration
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).