Runoff volume managed for more than leed boundary
NC-v4 SSc4:Rainwater managementposted by Sofia Barahona on
We have a current project, which is the 3rd stage of a data center complex. The fist two stages are already finish and started functioning some time ago.
Group or single project for Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Sofia Barahona on
We are currently working on a warehouse which has a total of 12,704.13m2, the project consist of a building of storage and operative offices with a total of 12,516.67m2 and a small separate spaces
Automatic Receptacles LEED Interpretation
NC-v4.1 EAp2:Minimum Energy Performanceposted by Sofia Barahona on
We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met.
100% Greenfield Site
NC-v4 SSc2:Site development - protect or restore habitatposted by Sofia Barahona on
If we are designing a project on a 100% greenfield land, therefore no previously developed area is present.
Distribution of preferred parking on mixed-used buildings
NC-v4 LTc8:Green vehiclesposted by Sofia Barahona on
Hi, we are working on a Core and Shell project which has mixed uses: offices and commercial.
Setback requirement
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
Hi,
We are working on an office building where some private offices are served by split system. How does the setback requirement is met on these specific HVAC system?
Ventilation in Corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Sofia Barahona on
We have a question regarding the ventilation requirements on corridors in order to comply with requirements of Minimum Indoor Air Quality Performance prerrequisite.
Manufacturing Plant Energy Consumption
NC-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are working on a project that is pursuing LEED v4: New Construction.
Mandatory Provision for Lighting Controls C&S
CS-v4 EAp2:Minimum energy performanceposted by Sofia Barahona on
We are currently working on a LEED Core and Shell v4 office building on Santiago, Chile.
Definition of Material Streams
NC-v4 MRp2:Construction and demolition waste management planningposted by Christopher Russell-King on
Hello, we are currently working on a new building under LEED V4, and we have doubts regarding what is considered a material "stream".