Exempt area of 10% in a Group Project

LEED Guidance for Campuses and Multiple Buildings
posted by  Gabriel Frasson  on 

We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (

1
Thu Jan 21, 2016, 1:03 pm

VRP Compliance Calculator or 62MZCalc for projects outside U.S.?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Geraldo Pithon  on 

I am submitting for review a project outside the US, in Brazil. The legislation of Brazil is very similar to that specified by ASHRAE 62.1.

1
Thu Feb 11, 2016, 10:33 pm

Calculation

NC-v4 EAc7:Green power and carbon offsets
posted by  Vitor Tosetto   on 

Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.

1
Wed Nov 30, 2016, 3:01 pm

Dist. Center - Light polution

Warehouses-NC-v4 SSc6:Light pollution reduction
posted by  Antonio Macedo Filho  on 

If the design of a distribution center worked 24 hours in 3 shifts, even at night, could we not get that credit? If we use external lighting with zone presence sensors would not it be possible?

1
Mon Aug 28, 2017, 3:55 pm

Zone Calculation Ds% for VAV System

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th

1
Mon Nov 17, 2014, 3:08 pm

Alarm to closed openings

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Vitor Tosetto   on 

Dears, When we have a Naturally Ventilated Space, we can use an alarm to indicate that the openings are close. Someone know if I can use an light alarm? or I must use an sound alarm?

0

VRF system

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  GISELA FARHAT DE ARAUJO  on 

We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?

1
Mon Jun 27, 2016, 6:00 pm

2012 EPA CGP comply with this prerequisite?

CS-2009 SSp1:Construction Activity Pollution Prevention
posted by  Pamela Svetllana Santos Souza  on 

I'm modelling for LEED C&S 2009 and the project has 26 floor type of mixed-use offices. Does the 2012 EPA CGP can be used instead of 2003 EPA CGP to comply with this prerequisite?

1
Sat Aug 26, 2017, 10:10 pm

Deadline for Appeal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Marcio Alberto Casado Pereira  on 

Hi Folks, We received the final decisiona on a very complicated industrial building we are pursuing certification for and EAp2 and IEQp1 were denied.