Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

HC near Airport

Healthcare-v2009 IEQc2:Acoustic environment
posted by  Saymon Grauppe  on 

Hello. I'm working on the design of a hospital and there is a doubt in the table 1.3-1 of the Sound & Vibration Guidelines FGI. The hospital is located 2600ft from the runway threshold .

2
Fri Jan 22, 2016, 9:54 pm
2
Mon Dec 7, 2015, 11:45 am

calculator v06

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  M. Galvao  on 

Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t

2
Sustainability Analyst
ETC Group
LEEDuser Basic Member
8 thumbs up
Thu Aug 27, 2015, 6:16 pm

Modeling of CHP

CS-2009 EAp2:Minimum Energy Performance
posted by  MARCIO OROFINO  on 

I am working in a project that had a previous consultant and we do not agree with the way the CHP shall be modeled.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon May 18, 2015, 5:57 pm

Energy Modeling In a High bay Industrial area + Office

NC-2009 EAp2:Minimum Energy Performance
posted by  Marcelo Maciel de Santa Helena  on 

What’s the best way to proceed with the energy model of the following case? The building is a 4000m² manufacturing building where there is a small office area and a large high bay industrial area.

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 9, 2015, 2:11 pm

Actual Material Cost vs. Material Cost: what's the difference?

NC-2009 MRc4:Recycled Content
posted by  Marcio Alberto Casado Pereira  on 

We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.

20
Default Avatar
Sustainability Consultant
Dagher Engineering
LEEDuser Basic Member
51 thumbs up
Fri Apr 3, 2015, 1:30 am

Services inside a mall would do?

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Marcio Alberto Casado Pereira  on 

We have a project built right next to a shopping center. The shoppping center has more than the 10 basic services inside. WoIuld those 10 sevices qualify?

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Mon Mar 2, 2015, 3:03 pm

Option 1: Zoning and controls

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Diego Pietzsch  on 

I've been working in a LEED CI: Retail for a small store in a mall. I'm wondering to persue the option 1: zoning and controls for the project but i'm not sure if the sales floor of the store shoul

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 27, 2015, 11:41 am

PBE Edifica for EAp2 compliance

CS-2009 EAp2:Minimum Energy Performance
posted by  Mauricio Torres  on 

Hello, we are developing a strategy to reach a C&S 2009 certification for a commercial building in Brazil. I've read the following from the USGB website: EAp2 "Option 4.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Jan 13, 2015, 3:25 pm

Stadium seating - need SRI? Is it an appurtenance/usable space?

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Marcio Alberto Casado Pereira  on 

We just got a review from a stadium Project we are working on in Brazil and the review team asked us to double check the roof area considered, stating that part of our seating area covers enclosed

2
Tue Oct 28, 2014, 12:57 am